Whakahiko Ngā Marae draft · 85 pages · four role reviews · 6 October 2026

Electric Marae Review

Four reviewers took the Rewiring Aotearoa draft apart from four angles: reframe (what the report should argue), copy (what is broken on the page), visuals (charts, illustration, layout) and comms (audiences, launch, asks). This page reconciles where they disagreed and puts the full reviews behind the tabs below. Everything here is a proposal for the Steering Rōpū.

85
pages, of which about 40 are placeholders, empty chart slots, skeleton case studies or author notes
0
charts carry marae data. Every chart is inherited from Electric Homes and Vehicles
5
naming schemes in play for the six marae profiles, and Table 1 defines a different six from the chart sections
1
sentence in the executive summary. Two full drafts are supplied in the tabs

Ten decisions to take before the next draft

Ranked by how much later work they unblock. Where two reviewers disagreed, the box underneath says who said what and which way this page leans.

  1. Reframe before renumbering Reframe + Copy

    Adopt the "Built to hold everyone" order: marae as Aotearoa's first infrastructure of care, then why the energy system does not fit the marae rhythm, then energy from your own whenua, then the modelled results, what the savings free up, your next decision, and finally what we are asking and of whom. Nothing is cut, only moved. Take this to the Rōpū before the heading and contents clean-up, or the renumbering gets done twice.

    If the Rōpū keeps the current order, the copy tab has a canonical outline (section 1.5) that fixes 4.1.0.1, 5.3.0.0.0.1, the misnested 5.5.3.x block, "6.2. 2", 6.3.0.x and 7.0.x without changing the argument.
  2. Six profiles, two labels, one model All four

    Give each profile a human name on the page and the model label in brackets on every chart and in the appendix. Retire "Quiet / Active / Constant", "Quiet / Average / Larger" and the use of "Larger" as a usage word. Jenny confirms the chart set is six profiles by North and South Island, because Table 1 (2 sizes by 3 usage levels) and the chart sections (3 usage levels by 2 islands) currently define different sixes.

    Three proposals. Reframe: name by the rhythm of the week (the weekend marae, the wānanga marae, the kōhanga marae, the homecoming marae, the rūnanga marae, the seven-day marae). Copy: Smaller / Larger by Quiet / Active / Busy. Visuals: Smaller / Larger by Low / Medium / High use, matching Table 1. This page leans to the reframe names on the page, tested with two or three committees and replaced by the Rōpū if they prefer reo names, with "Smaller, high use" style model labels underneath so nothing in the modelling changes.
  3. Lead with "make your next decision an electric one" Reframe + Comms

    The fully Electric Marae definition stays as the horizon, not the entry bar. For a volunteer committee with a dying califont the purity frame reads as "not for us". The six-step chapter is reorganised around the moment of replacement, with a one-page table: when this dies, choose this, ask for this.

  4. Write the executive summary twice Reframe + Copy

    A 420-word version in the foreword's voice for the Rōpū and the Iwi Chairs Forum (reframe tab, section 5) and a 250-word single paragraph for the web page and two-pager (copy tab, sample A). Both carry [$X] placeholders until the modelling lands. For the Forum audience the summary is the report.

  5. One hero number, one source sheet Comms + Copy

    The report has no headline figure. The candidate is the yearly saving for the medium-use marae with solar and batteries, paired with "over 1,000 marae, two-thirds in a hazard zone". Jenny owns a single numbers sheet and every chart and tile builds from it. Reconcile the contradictions now: heat pump "2 to 4 times" vs "3 to 4" vs "325% efficiency", EV "3 to 5 times" vs "2 to 4", gas connection $720 vs $800, electricity "85% renewable" vs energy "30% renewable", the ATV "4 hours a week, 6,240 hours a year".

  6. One chart system, paper and ink Visuals

    Colour carries energy-source meaning and nothing else: fossil fuel in ink, grid electricity in blue, solar in yellow, battery in hatched yellow, upfront cost in mint, savings only ever as a green bracket, emissions only ever in red. Before is always left, after is always right. North and South Island are told apart by position, never by colour. Charts generate once from JSON, so Jenny's updates regenerate without redraws, and the set survives a mono photocopy.

    Palette. Visuals recommends the 2026 paper-and-ink palette over the Electric Homes navy: warmer, cheaper to print, and the kaupapa does not want a dark corporate frame. Comms left this to the designer. Confirm with Elliot before the page template is built.
  7. No watercolour, no product renders Visuals

    The authors' "labelled watercolour" idea gives labels nothing to hang on, sits outside the Rewiring family, prints muddy and invites the generator to complete a wharenui with carvings. Use the colour marker-doodle style for the Electric Marae diagram, six vignettes, nine section openers, the six-step journey and a 13-icon machine set. Use consented photographs of real marae with the yellow scribble for case studies and as the alternative cover. Replace the branded ATV renders with neutral silhouettes and a model table.

    Cultural rules for every image. Never generate carvings, koruru, tekoteko, tukutuku, kōwhaiwhai, tā moko or an identifiable marae. Wharenui drawn as a plain gable. Solar on the wharekai, ablutions and shed by default; the wharenui roof is a Rōpū decision. Kai kept away from the wharenui in the diagram. Sign-off pack for the Rōpū: cover, diagram, vignettes, any photo of a real marae.
  8. Every resilience line says "solar with a backup-capable battery" Comms + Visuals

    Standard grid-tied solar shuts down in an outage. The draft repeatedly says solar and batteries "keep the lights on". If the wording is not tightened, installers and lines companies will discredit the resilience case. Add a plain box to the report and the Solar for Marae guide: ask your installer for backup capability and which circuits it covers.

  9. Policy asks get owners Comms + Reframe

    Section 9.1 is prose addressed to "Government". The comms tab rewrites it as nine numbered asks, each with a decision-maker. Ask 1 is a standing Marae Electrification and Resilience Fund to replace the Māori Climate Platform, which the comms reviewer found ended on 30 June 2026 after helping 60-plus marae. Lead with cost of living and resilience in Government rooms and mana motuhake in Māori rooms, and never drop either.

    Resolve the apparent contradiction between "Marae are not businesses" (5.2.3) and marae as sites of tauhokohoko (3.1) in one sentence: exchange grounded in reciprocity, not profit, so classification should follow purpose, not kilowatts. That turns a weak spot into the report's sharpest policy point.
  10. The calendar has moved Comms

    The planning tab targets the Iwi Chairs Forum on 28 July. That has passed and the draft is half complete. The comms tab proposes Rōpū sign-off in early November, presentation at the 23 to 25 November Forum hui at Tākina in Wellington, and a public launch on Tuesday 9 February 2027 rather than a December release. Case-study consents need four weeks minimum, so they start now.

    Verify before planning. The Forum dates and the Platform funding status were web-checked by the comms reviewer on 6 October, not confirmed with NICF or MfE.

Two smaller calls that sit with the Rōpū: make the Rōpū the "we" of the whole report and name Rewiring in the third person, crediting the author of the mātauranga chapter; and send the title grammar ("Whakahiko Ngā Marae" on the cover against "Whakahiko i te marae" in the text) to a reo expert.

Who does what next

Split so the four streams run in parallel. Design and comms can start without the modelling; the profile charts cannot.

Authors and Steering Rōpū

Decide, then fill

  • Rule on the frame, the profile names, the "we" voice and the title grammar
  • Replace the one-sentence executive summary
  • Fill the three empty "Overcoming this challenge" responses, the three case studies, the conclusion, glossary, appendix and references
  • Te reo pass: hapū, Papatūānuku, kaumātua, wharenui and wharekai as single words, Te Tairāwhiti, and "Kiritapu Allan" on the title page
  • Start case-study consents with Ōnuku, Whakatū and a flood or cyclone marae now
Jenny, modelling

Numbers first

  • The core matrix: 6 profiles by 2 islands by 4 scenarios by bills and bills-plus-upfront, as one JSON or CSV
  • Emissions per profile in the same shape
  • The stacking waterfall for one profile
  • Marae-scale per-machine costs and emissions, three vehicle examples, mowers, solar option cards, regional prices, load shapes, backup hours
  • The single numbers sheet that every tile and chart cites
OJ, design

Can start now

  • Chart template on the colour system, proven on one existing chart, then the 12 existing-data rebuilds
  • 13-icon machine set, the Electric Marae diagram base and six vignette bases, packaged for Rōpū sign-off
  • Cover concepts: doodle composite, plus a consented photo if one arrives
  • Page template, six-profile strip component, mint callout panel, case study spread
  • Two-pager and topic one-pager template
Blocked on Jenny: the twelve profile chart pairs, the waterfall, per-machine charts, vehicle cards, the executive summary numbers.
Comms

Build the launch

  • Agree the hero number and the launch date
  • Add the backup-battery wording everywhere resilience is claimed
  • Convert 9.1 into the owned ask list and brief NICF
  • Specify the nine secondary resources plus the hui deck, three case-study videos and a ministerial one-pager
  • Scope the "which marae are you" picker for the web page
  • Māori media list and embargo plan

The four reviews were produced on 6 October 2026 by role agents working from the PDF draft and the Google Doc planning and notes tabs. Page numbers refer to the PDF. Facts the comms review gathered from the web (Forum dates, Platform funding, marae counts) are marked in its section 0 and should be re-verified before use. Source files sit in Downloads\electric-marae-review.