Four reviewers took the Rewiring Aotearoa draft apart from four angles: reframe (what the report should argue), copy (what is broken on the page), visuals (charts, illustration, layout) and comms (audiences, launch, asks). This page reconciles where they disagreed and puts the full reviews behind the tabs below. Everything here is a proposal for the Steering Rōpū.
Ranked by how much later work they unblock. Where two reviewers disagreed, the box underneath says who said what and which way this page leans.
Adopt the "Built to hold everyone" order: marae as Aotearoa's first infrastructure of care, then why the energy system does not fit the marae rhythm, then energy from your own whenua, then the modelled results, what the savings free up, your next decision, and finally what we are asking and of whom. Nothing is cut, only moved. Take this to the Rōpū before the heading and contents clean-up, or the renumbering gets done twice.
Give each profile a human name on the page and the model label in brackets on every chart and in the appendix. Retire "Quiet / Active / Constant", "Quiet / Average / Larger" and the use of "Larger" as a usage word. Jenny confirms the chart set is six profiles by North and South Island, because Table 1 (2 sizes by 3 usage levels) and the chart sections (3 usage levels by 2 islands) currently define different sixes.
The fully Electric Marae definition stays as the horizon, not the entry bar. For a volunteer committee with a dying califont the purity frame reads as "not for us". The six-step chapter is reorganised around the moment of replacement, with a one-page table: when this dies, choose this, ask for this.
A 420-word version in the foreword's voice for the Rōpū and the Iwi Chairs Forum (reframe tab, section 5) and a 250-word single paragraph for the web page and two-pager (copy tab, sample A). Both carry [$X] placeholders until the modelling lands. For the Forum audience the summary is the report.
The report has no headline figure. The candidate is the yearly saving for the medium-use marae with solar and batteries, paired with "over 1,000 marae, two-thirds in a hazard zone". Jenny owns a single numbers sheet and every chart and tile builds from it. Reconcile the contradictions now: heat pump "2 to 4 times" vs "3 to 4" vs "325% efficiency", EV "3 to 5 times" vs "2 to 4", gas connection $720 vs $800, electricity "85% renewable" vs energy "30% renewable", the ATV "4 hours a week, 6,240 hours a year".
Colour carries energy-source meaning and nothing else: fossil fuel in ink, grid electricity in blue, solar in yellow, battery in hatched yellow, upfront cost in mint, savings only ever as a green bracket, emissions only ever in red. Before is always left, after is always right. North and South Island are told apart by position, never by colour. Charts generate once from JSON, so Jenny's updates regenerate without redraws, and the set survives a mono photocopy.
The authors' "labelled watercolour" idea gives labels nothing to hang on, sits outside the Rewiring family, prints muddy and invites the generator to complete a wharenui with carvings. Use the colour marker-doodle style for the Electric Marae diagram, six vignettes, nine section openers, the six-step journey and a 13-icon machine set. Use consented photographs of real marae with the yellow scribble for case studies and as the alternative cover. Replace the branded ATV renders with neutral silhouettes and a model table.
Standard grid-tied solar shuts down in an outage. The draft repeatedly says solar and batteries "keep the lights on". If the wording is not tightened, installers and lines companies will discredit the resilience case. Add a plain box to the report and the Solar for Marae guide: ask your installer for backup capability and which circuits it covers.
Section 9.1 is prose addressed to "Government". The comms tab rewrites it as nine numbered asks, each with a decision-maker. Ask 1 is a standing Marae Electrification and Resilience Fund to replace the Māori Climate Platform, which the comms reviewer found ended on 30 June 2026 after helping 60-plus marae. Lead with cost of living and resilience in Government rooms and mana motuhake in Māori rooms, and never drop either.
The planning tab targets the Iwi Chairs Forum on 28 July. That has passed and the draft is half complete. The comms tab proposes Rōpū sign-off in early November, presentation at the 23 to 25 November Forum hui at Tākina in Wellington, and a public launch on Tuesday 9 February 2027 rather than a December release. Case-study consents need four weeks minimum, so they start now.
Two smaller calls that sit with the Rōpū: make the Rōpū the "we" of the whole report and name Rewiring in the third person, crediting the author of the mātauranga chapter; and send the title grammar ("Whakahiko Ngā Marae" on the cover against "Whakahiko i te marae" in the text) to a reo expert.
Split so the four streams run in parallel. Design and comms can start without the modelling; the profile charts cannot.
Reviewer role: reframing and narrative strategist. Read: BRIEF.md, marae_clean.txt (85 pages), gdoc_planning_notes.md. Date: 2026-10-06. For the Steering Rōpū and the Rewiring authors. Everything here is a proposal for the Rōpū to accept, adapt or reject.
As a reader experiences it, the draft says: "Electrification is cheaper, cleaner and more resilient, as our earlier reports showed for homes and farms, and here is the same case run again for marae." The structure is the Electric Homes template with a marae skin: background and mātauranga preface, then the generic electric opportunity, then a long "Benefits" chapter sorted by category (economic, environmental, resilience, mana motuhake, national), then a six-step how-to, then financing and policy. The reader meets the marae-specific truth of the report (the tangihanga spike, the tariff trap, the marae as refuge in the floods, fuel from the other side of the world) only after 20 to 60 pages of material they could have read in Electric Homes.
(a) Technology and economics lead; the strongest material is buried. Section 3.2 restates efficiency ratios and price curves from the Homes report before the reader knows why marae are different. Meanwhile the lines that only this report can say sit in 4.1, 5.2.3, 6.3 and 6.4: "a single weekend of manaakitanga can set the tariff rate, and the bill, for months"; "Marae are not businesses"; "two-thirds of marae are exposed to at least one significant hazard"; "the very events that make marae so essential are also the events most likely to cut their power"; "controlled by others, priced by others, and shipped in from the other side of the world." These are the thesis. They should be on page one, not page 66.
(b) "Benefits" positions marae as recipients. A benefits chapter answers "what do marae get?" The foreword, 3.1 and 9.3 all say something stronger: marae already are infrastructure (refuge, feeding, civil defence, trade) and the energy system has never recognised them as such. The report should be written from the marae outward, with Government, retailers and installers as the parties that need to change, not as the givers of benefits.
(c) The mātauranga section is a preface, not the spine. Section 3.1 is the best writing in the report and it carries the organising ideas: people and atua are one; marae as refuge "when nature puts us back in our place"; marae as sites of tauhokohoko; "science asks us to test and prove, mātauranga asks us to watch, to listen, to remember." Right now it is a beautiful room off the hallway. It should be the hallway. Each later chapter can open from one of its ideas (reciprocity for the economics, refuge for resilience, kinship with Papatūānuku for emissions, on our own terms for sovereignty).
(d) The six profiles are an engineering grid. Smaller/Larger by Low/Medium/High is correct for the model and wrong for the reader. The planning tab wants marae to "see themselves somewhere in the report." Nobody recognises themselves as "Larger, Medium use." They recognise "staffed Monday to Friday with a kōhanga, full every second weekend." The three naming systems in the draft (Quiet/Active/Constant; Quiet/Average/Larger; Low/Medium/High) also conflate size with usage. See section 4 for fixes.
(e) The executive summary is one sentence. For the Iwi Chairs Forum audience, the executive summary is the report. It must carry the thesis, the headline number, the ask, and the voice. Draft provided in section 5.
(f) "Fully Electric Marae" purity versus "make your next decision an electric one." Section 5 defines the destination as a marae with no fossil fuels at all and says "we believe every marae in Aotearoa should have the opportunity to become a fully Electric Marae." Section 5.2.5 and 9.2 say the realistic path is one replacement at a time. Both are true, but the report leads with the purity definition and tucks the real ask at the end. For a volunteer committee with a dying califont, the purity frame reads as "not for us." Lead with the decision; keep "fully electric" as the horizon.
(g) Deficit versus strengths. The draft repeatedly describes marae as ageing, volunteer-led, under-funded, mis-sold to and mis-classified. All true, and all necessary for the policy case. But stacked together without the counterweight, the marae reads as a problem to be fixed. The counterweight exists in the text: marae mobilise "faster than centralised agencies and without waiting to be asked"; marae have fed hundreds at short notice for generations; marae already hold the land, the roof, the parking, the connection and the people. The resolution is to put the strength first and name the deficit as a mismatch between the marae and the system, not as a flaw in the marae. "The system was built for steady demand. Marae were built for manaakitanga." The problem belongs to the system.
(h) The title. Three observations for the Rōpū and a reo expert to rule on; I am not the authority here. - "Whakahiko Ngā Marae" reads as a verb followed by a plural noun with no object marker. The draft's own text in 3.1 uses "Whakahiko i te marae," which carries the particle "i" marking the object and is the form a reader of te reo would expect. If the plural ambition matters, "Whakahiko i ngā Marae" keeps both. - "Electric Marae" as the English title has the series value (Electric Homes, Electric Farms) and should stay as the subtitle or English half. It is a noun. The reo title is a verb. That is a good pairing: the action in te reo, the state in English. - Whatever is chosen, use it consistently. The draft uses "Whakahiko Ngā Marae" on the cover and in the acknowledgements, "Whakahiko i te marae" in 3.1, and "Electric Marae" everywhere else.
Thesis. Marae were Aotearoa's first public infrastructure: the place that feeds, shelters and holds a whole community at once. The energy system was never built for that load. Electrification is how we power marae for what they actually do.
Emotional journey. Recognition (that is my marae) → grievance with a target (the system does not fit us, and we are paying for it) → possibility (what an electric marae makes possible) → agency (our next decision) → mandate (what we ask of Government and iwi).
Section order with existing content mapped in. 1. Foreword (Marama Royal) and Steering Rōpū. 2. Executive summary (new, section 5 below). 3. He marae, he manaaki: what a marae is and does. Pulls 4 (Marae in Aotearoa), the refuge and tauhokohoko passages of 3.1, and the resilience narrative of 6.3 (Gabrielle, Te Tai Tokerau, Vaianu, two-thirds exposed). This chapter establishes marae as infrastructure before any kilowatt is mentioned. 4. Why the system does not fit marae. Pulls 4.1 (energy practices, "energy profiles differ"), 5.2.1 to 5.2.6 (fixed charges, irregular demand, tariff misclassification, gas, ageing buildings, navigation). The tangihanga load curve is the centrepiece figure. 5. Energy from your own whenua. Pulls 3.2 (the electric opportunity, condensed to a third), 6.4 (from the other side of the world), the "almost always sunny" map, and the "stacking savings" logic from 6.1.3. This is where efficiency, solar cost curves and the Aotearoa-made energy idea belong, framed as "the way out." 6. What an electric marae makes possible. The modelled results. Six profiles with human names (section 4), bills and emissions before and after, per-machine results, vehicles and taiao machines, the three case studies interleaved. Pulls 5 (definition), 5.3 to 5.5, 6.1.5 to 6.1.7, 6.2. 7. What it frees up. Pulls 6.1.3 (savings reinvested), 6.1.4 (kaupapa Māori installers, rangatahi trades, public charging, SMEs), 5.1 (papakāinga and kōhanga), 6.5 (contribution to Aotearoa). This is the rangatiratanga chapter: money and capability that stay in the hapū. 8. Your next decision. Pulls 7 (six steps, reorganised around the moment of replacement), 5.2.5 "overcoming this challenge," and the "find your marae" device. Includes a one-page "when X dies, choose Y" table. 9. What we are asking, and of whom. Pulls 8 (financing) and 9 (advocacy, direct support, investing), restructured as asks addressed to Government, to the Electricity Authority and retailers, to funders, to iwi and rūnanga, to installers. 10. Conclusion, glossary, methodology, references.
Headline. "Built to hold everyone. Powered like a corner shop." (Or, gentler: "Marae are infrastructure. It is time we powered them like it.")
Risks. "Infrastructure" is a Pākehā policy word and can flatten what a marae is; it needs the Rōpū's own language around it. The frame also leans on grievance against the system; if overplayed it reads as a complaint rather than a plan.
Thesis. Everything that is wrong with how marae are powered, and everything that electrification fixes, follows from one fact: a marae sits quiet for weeks and then runs flat out for three days. Size it, price it, fund it and build it for that, and the rest follows.
Emotional journey. Instant recognition (every committee has lived the tangihanga bill) → technical clarity (now I understand why the bill looks like that) → relief (there is a design that fits) → confidence (I know what to ask an installer and a retailer for).
Section order. 1 Foreword. 2 Executive summary. 3 Three days in fifth gear: the marae load profile (4.1, 5.2.2). 4 What the spike costs you today: fixed charges, demand charges, three-phase, misclassification, mis-sized systems, generators that cannot be refuelled (5.2.1, 5.2.3, 5.2.4, 5.2.6). 5 What the spike means when the lights go out: resilience (6.3, 6.4). 6 Designing for the spike: grid-connected solar and batteries sized for the quiet months, electric machines that run on your own generation, tariffs that fit (5, 5.2.2 "overcoming," 6.1.3, 3.2 condensed). 7 Six marae, six spikes: the profiles and modelled results (5.3 to 5.5, 6.1.5, 6.2). 8 One machine at a time (7, 5.2.5). 9 Fixing the rules for the spike: the asks (8, 9). 10 Mātauranga and the longer view (3.1, moved to close rather than open, as the lens that makes sense of all of it).
Headline. "A single weekend of manaakitanga should not set the bill for months."
Risks. It is a brilliant organising insight for committees and for the Electricity Authority, but it is narrow for the Iwi Chairs Forum and for funders, who need the sovereignty and resilience story up front. It also makes tangihanga the recurring motif of the whole report, which the Rōpū may feel is not the right tone for the cover and headline, even if it is the right example inside.
Thesis. The fuel a marae burns to care for its people is priced by others and shipped from the other side of the world. The energy it could run on falls on its own roof. Electrification is rangatiratanga over the thing that makes manaakitanga possible.
Emotional journey. Dependency named (the LPG bottle, the tanker count, Hormuz) → the alternative seen (your own whenua, your own sun) → the economics that prove it is not a dream → the plan → the asks.
Section order. 1 Foreword. 2 Executive summary. 3 Mātauranga, atua and energy (3.1 in full, as the opening argument). 4 Controlled by others: imported fuel, gas decline, rising prices (6.4, 5.2.4, 5.2.1). 5 Made on your whenua: the electric opportunity (3.2, 6.1.1, 6.1.3). 6 What it means for a marae: profiles and results (5, 5.3 to 5.5, 6.1.5 to 6.2). 7 Holding your own power: resilience (6.3). 8 What stays in the hapū: savings, jobs, trade, energy precincts (6.1.3, 6.1.4, 5.1, 6.5, 9.3). 9 Your next decision (7). 10 What we are asking (8, 9).
Headline. "Energy from your own whenua."
Risks. It is the frame most aligned with the foreword and with the Iwi Chairs Forum, but it is the least specific to marae; the same argument is made in Rewiring's national work. It can drift into a national energy-security essay and lose the committee reader. It also puts the geopolitics (Ukraine, Hormuz) higher than the marae's own lived experience.
Frame A is the only one of the three that is about marae and nothing else. It starts where the foreword starts (marae as the beating heart, as refuge) and where 3.1 starts (marae as the place of reciprocity, caring and mobilisation). It gives the deficit material a target that is not the marae: the system was built for steady demand and the marae was built for manaakitanga. It gives the benefits chapter a verb ("what an electric marae makes possible") and the policy chapter an addressee ("what we are asking, and of whom"). It can carry Frame B whole, as chapter 4 and as the centrepiece figure, and it ends on Frame C's note in the "what it frees up" and "asks" chapters, which is where the Iwi Chairs Forum and Government readers will be when they finish.
The one change I would make to Frame A as sketched: open chapter 3 with 3.1's own words, not with Tapsell's definition of marae. Let the Māori authors define the marae in their voice first and the academic citation support it second.
Keep the model mapping exactly: Smaller/Larger footprint by Low/Medium/High use, each with North Island and South Island heating. Change only how they are named and described. Name them by the rhythm of the week, because that is what a committee knows without looking at a bill.
| Model cell | Proposed name | One-line description a committee recognises |
|---|---|---|
| Smaller, Low | The weekend marae | One wharenui, one wharekai. A fridge and a security light most weeks, then three days flat out when there is a tangi or a hui. |
| Smaller, Medium | The wānanga marae | Someone is on site two or three days a week: wānanga, a support service, a part-time office. Overnights roughly once a week. |
| Smaller, High | The kōhanga marae | A kōhanga reo, kura programme or clinic runs Monday to Friday. The marae is a workplace as well as a marae, and sleeps people most weeks. |
| Larger, Low | The homecoming marae | Big whare, big kitchen built to feed hundreds, hapū spread across the motu. Quiet for weeks, then full for tangihanga, Christmas, reunions and hui-ā-iwi. |
| Larger, Medium | The rūnanga marae | An office or rūnanga staffed through the week, hui most weekends, a kōhanga or kaumātua flats nearby. Steady weekday use plus the same spikes as everyone else. |
| Larger, High | The seven-day marae | Pan-iwi or urban, multiple buildings and services, staff and visitors every day. Energy use looks like a small institution, with tangihanga on top. |
Notes for the authors. - The names are deliberately English and descriptive. If the Rōpū wants reo names, they should come from the Rōpū, and ideally be tested with a few committees for instant recognition. - Every description should end with the same reminder: "and three days flat out when there is a tangi." That is the shared truth across all six and it stops the High-use profiles from reading as "the real marae" and the Low-use ones as the poor cousins. - Drop the three competing label sets (Quiet/Active/Constant, Quiet/Average/Larger, Low/Medium/High). "Average marae" and "Larger marae" in 6.1.6 are a size and a usage label mixed together and will confuse the charts. - Section 5.5.3.1 to 5.5.3.3 (Low/Medium/High usage descriptions) currently sit under "Larger marae" but describe usage in general. Move them to the profile introduction and make them the six descriptions above. - The profile figure asked for ("x axis of usage vs y axis of footprint") should plot the six names, not the six codes, with a dotted line through the middle labelled "Where is yours?"
"Find your marae" device (three questions, on one page, before the profiles).
Then: "Turn to your marae on page X. If you sit between two, read both; your savings will be between them."
Whakahiko i te Marae: Electric Marae
For as long as there have been marae, they have done the work that the rest of Aotearoa later built institutions to do. They feed hundreds at a day's notice. They house the grieving and the travelling. When the river rises or the lines come down, they open their doors before anyone asks. Marae were our first infrastructure of care, and they still are.
The energy system has never been built for that. It is built for steady demand: a home that uses a little every day, a business that uses a lot every day. A marae does neither. It sits quiet for weeks and then runs in fifth gear for three days of manaakitanga. The system punishes that rhythm. Marae pay commercial fixed charges for capacity they use a handful of days a month. A single tangihanga can set the demand tariff for months. Installers size systems for households. Retailers put marae on the wrong plans and nobody notices for years. And the fuel that keeps the wharekai cooking and the water hot is priced on the other side of the world and shipped here in a chain that breaks more often each year.
Two-thirds of marae are exposed to at least one significant natural hazard. The same events that make a marae essential are the events most likely to cut its power and its gas.
This report shows that an electric marae, one that heats, cooks and heats water with efficient electric machines, generates its own energy from its own roof and stores it on site while staying connected to the grid, fits the marae rhythm in a way fossil fuels never could. Across six composite marae, from the weekend marae to the seven-day marae, in the North and South Islands, electrification saves between [$X] and [$Y] a year on energy bills, cuts energy emissions by around [Z] per cent, and keeps the wharenui warm and the wharekai cooking when the grid is down. For the machines marae already own, the electric replacement is cheaper over its life in [almost every] case we modelled.
That saving is not the point. It is what the saving makes possible: money that stays in the hapū for reo, for kaumātua, for the roof that has waited ten years; rangatahi trained in the trades that build it; a marae that can share power with its papakāinga and charge the whānau's cars from its own sun.
None of this needs to happen at once. The most powerful thing any marae can do is make its next decision an electric one: when the califont, the hob, the heater or the van reaches the end of its life, choose the electric option. Made consistently, those decisions electrify a marae without a single large outlay.
What marae cannot do alone is change the rules. We ask Government to fund the machines and not just the roof, to sustain the platforms that have already electrified more than sixty marae, and to set fair prices for the power marae export and share. We ask the regulators to recognise that marae are not businesses. We ask iwi and rūnanga to bring their marae's next decisions forward, and, where they can, to own a stake in the system that serves them.
Marae have always held everyone. It is time the energy system held marae.
Marae were Aotearoa's first infrastructure of care, and the energy system was never built for them. Electrification fits the marae rhythm: quiet for weeks, full for days. Across six composite marae it saves [$X to $Y] a year, cuts emissions and keeps the lights on in a crisis. The ask: make your next decision electric, and change the rules so every marae can.
Marae have always held everyone; an electric marae, powered from its own whenua and priced for what it actually does, is how the energy system finally holds marae.
Where the draft risks speaking over marae and iwi. - The six-step "Getting started" chapter reads as consultant prose ("leadership ensures that every technical decision remains grounded in the wider kaupapa"). Marae committees have run projects for generations. Reframe as "what marae that have done this told us," drawing on the case studies, rather than as instruction. - "Marae are not always well served" and "marae committee needing more specialist knowledge than they can realistically be expected to have" are true but place the limitation on the committee. Restate as the system's failure to explain itself. - "We believe every marae in Aotearoa should have the opportunity" (5): who is "we"? See voice note below. - The vehicles, ATV and chainsaw sections use product names (Polaris, Honda, HDK Turfman) that read as a buyer's guide. Keep the comparisons but keep the brand detail in figures and footnotes, not in the body of a Rōpū-authored report.
Where whakataukī or kōrero from the Steering Rōpū could anchor sections (invite, do not invent). - Chapter opener for "He marae, he manaaki": a kōrero from a Rōpū member on what their marae did in Gabrielle, the January 2026 floods or Vaianu. The report currently cites Vercoe and Awatere; a first-person account from the Rōpū would carry more weight than either. - "Why the system does not fit marae": a committee member's own words about the bill after a tangi. The draft's line "a single weekend of manaakitanga can set the tariff" is strong, but a real voice saying it is stronger. - "Energy from your own whenua": the Rōpū may have a whakataukī about Tama-nui-te-rā or about the land providing that they would want here. Ask; do not supply one. - "Your next decision": a kaumātua or committee chair from one of the case study marae on the moment they chose the heat pump or the induction hob. - Conclusion: Marama Royal or the Rōpū chair, closing in their voice.
"We / our" voice. The draft has two authors inside it. Section 3.1 says "our rangatira," "our narratives," "our marae," and means Māori. Section 5.2.2 says "makes Rewiring Aotearoa a strong proponent" and section 6.1.1 says "our own national audit," and means Rewiring. Both voices are legitimate but the reader cannot always tell who is speaking, and in a report with a Māori Steering Rōpū, that ambiguity is a risk. Two options: (1) make the Rōpū the "we" of the whole report and name Rewiring in the third person for its modelling and prior work; or (2) keep a plural "we" but state in the acknowledgements who holds the pen and who holds the kaupapa. Option 1 is cleaner and more honest to the Iwi Chairs Forum audience. Either way, the mātauranga chapter should carry its author's name, because that voice is personal and should be credited.
"Marae are not businesses" versus "marae as sites of tauhokohoko." Section 5.2.3 says marae are not businesses; section 3.1 and 6.1.4 say marae have always been places of trade and exchange and should be again. These are not in conflict, but the draft does not say why, so a sceptical reader (a retailer, a Treasury analyst) will spot it. The resolution is already in 3.1: tauhokohoko is exchange "grounded in kinship and reciprocity," not commerce for its own sake. Say it in one sentence in 5.2.3: "Marae trade, host, feed and employ, and have always done so, but they do it as an act of manaakitanga, not to return a profit to shareholders. A tariff that treats a tangihanga as a factory shift has misunderstood what it is looking at." That turns an apparent contradiction into the report's sharpest policy point: the classification should follow the purpose, not the kilowatts.
Two smaller checks. - The Tapsell quotation and the Vercoe and Awatere citations are the only Māori scholarship cited by name. If the Rōpū has other sources it wants acknowledged (hapū histories, iwi climate strategies, the Electrification Iwi Leaders Group's own papers), the references chapter is empty and ready for them. - "Papatūānuku" and "Tāwhirimātea" appear with inconsistent macrons and capitalisation across sections (Papatuanuku on page 8, papatūānuku on page 18). A reo proofread before the Forum.
Top-line recommendation: adopt Frame A ("Built to hold everyone"), move the resilience and sovereignty material to the front, rename the six profiles by the rhythm of the week, and replace the executive summary with the draft in section 5 once Jenny's numbers are in.
Reviewer role: copy editor. Date: 2026-10-06. Source: marae_clean.txt (85 pages, PDF text extraction). Page numbers below are PDF pages as marked in the extract.
How to read this: Section 1 is structural (what is missing, misnumbered or in the wrong place). Section 2 is line-level (quote, page, fix). Section 3 is te reo Māori and macrons. Section 4 is numbers and claims. Section 5 is tone and a proposed house style. Section 6 is the ranked top 10. Two sample rewrites sit at the end.
Overall state: the argument and the voice of the best sections (3.1, 4, 5.2, 6.1.1 to 6.1.4, 6.3, 6.4, 9) are strong and publishable with a line edit. Roughly 40 of 85 pages are empty chart pages, skeleton case studies, author notes or placeholders. The report is not yet at a stage where a full line edit pays off, so this review concentrates on the things that must be resolved before a Steering Rōpū read, plus an exhaustive list of what is already fixable.
| Page | Item | What is needed |
|---|---|---|
| 1 | "EB Version, Electric Marae report" in the author line. No report title on the title page. | Remove version tag. Add full title "Whakahiko Ngā Marae: The Electric Marae" (or final title), date, Rewiring Aotearoa. |
| 2 | Heading "Foreword - Marama". Opening quotation mark never closed. | "Foreword" with byline "Marama Royal, Chair, Pou Take Ahuarangi, National Iwi Chairs Forum". Drop the quote marks or close them with a signature line. |
| 4 | Contents lists "5.3.0.0.0.1. Table X", "6.1.6.9.1", "6.2. 2 Environmental benefits", "6.3. 3", "6.4. 4", "6.5. 5", and "15. Information we need:". | Regenerate TOC after fixing headings (see 1.2). Remove section 15 from the public document. |
| 5 | Blank page. | Remove or use for a key-findings spread. |
| 6 | Executive summary is one sentence. | Write it (draft supplied at end of this review). |
| 7 | "Put simply, running the machines that power your…" sentence fragment left mid-paragraph. | Finish or delete. |
| 11 | "[here -add hyperlink]"; "While Figure X shows indices, Figure X below shows"; stray ". ." | Two charts needed (price indices; cost per kWh). Number them. |
| 13 | "As shown in Figure X below, switching to an EV reduces vehicle operating emissions by >85%"; "As shown below, around 70%"; caption "Figure 5 New Zealandʼs energy consumption in 2024". | Two charts needed. Figure 5 is the only numbered figure in Section 3; renumber sequentially. |
| 16 | Heading "4.1.0.1. Energy profiles at marae differ". | Should be 4.2 (or 4.1.1). |
| 17 | "[graphic of a fully electric marae- labelled watercolour?]" | Illustration brief for OJ. |
| 18 | "[Add something here about the fluctuating costs of generation, dry year risk, and structural ownership issues…]"; "(REF)" x4 and "(RNZ - REF)". | Write or delete the bracketed note. Supply references. |
| 18 to 23 | Six "Overcoming this challenge" run-in headings. 5.2.1, 5.2.2 and 5.2.5 have body text. 5.2.3 (p21, only a bracketed question), 5.2.4 (p22, empty) and 5.2.6 (p23, runs straight into 5.3) have none. | Write the three missing responses or drop the subheading pattern and fold the response into each challenge. Make the heading a real subheading, not a run-in line. |
| 19 | "(as shown in the graph below)"; stray "t" at end of paragraph. | Chart needed (delivered cost of energy). Delete "t". |
| 21 | "[Is there something about time of use + negotiating prices etc that can be suggested?]"; "[graph? Or graphic]"; "(REF)", "(Ref)", "(ref)". | Resolve. |
| 24 | "[graph to situate the 6 marae profiles - x axis of usage vs y axis of footprint]"; "The full list of assumptions is outlined at the end of the report" (Appendix is two bullets). | Chart needed. Appendix must be written. |
| 25 | "(Section X)" twice. Table 1 contains working notes: "Unsure of assumption we can make here to turn into solar space? 25%?" twice. | Cross-refs. Decide the roof-to-solar assumption and state it. |
| 26 | "Figure X", "Figure Y" for heating-needs and electricity-price maps. Benchmark table unnumbered. | Two maps needed. Number as Table 2. |
| 27 | "[chart of regional electricity prices]"; "5.4. Smaller marae Xm2 - Xm2"; watercolour placeholder; 5.4.1 and 5.4.2 "[description]". | Fill. |
| 28 | "5.4.3. High usage Usage:" with no descriptor; watercolour placeholder; 5.5.1 to 5.5.3 "[description]"; then 5.5.3.1 to 5.5.3.3 (see 1.3). | Fill. |
| 29 | "The ma" fragment; watercolour placeholder. | Finish or delete. |
| 31 | "[waterfall graph showing how savings stack up as you electrify more machines for marae profile 2…]" | Chart needed. |
| 32 | "Rural Electric EV Charging" orphan subheading with no body; "6.1.5. Marae profiles Charts showing bill & net savings before & after…" is an author note in body position. | Delete orphan or write it. Convert note to an intro sentence. |
| 32 to 37 | 6.1.5.1 Quiet, 6.1.5.2 Active, 6.1.5.3 Constant use marae: six chart slots ("North Island example" / "South Island example") all empty. | Six charts. |
| 38 | "6.1.6. Per-machine savings For each machine … show charts comparing yearly bills and lifetime costs" author note. | Convert to intro. |
| 41 | Blank page. | Chart slot (space heating). |
| 42 | "These are explored further in Section 3." Wrong: indoor air quality is 6.2.5.2, which is also empty. | Fix cross-ref once 6.2.5.2 exists. |
| 43 | "[Commentary here on the cost of buying energy increasing…]"; "Key Questions answered -Pricing? -Exporting Solar…" skeleton. | Write 6.1.6.4. |
| 44 | "Table/chart of solar capacity per region…"; "Batteries - Why should we have - refer to resilience below." | Write. |
| 45 | Blank page. | |
| 46 | "Marae profile savings with and without solar & batteries [The following charts show…]" no charts. | Charts. |
| 47 | "Quiet marae Average marae Larger marae" labels, no charts. "Vehicle Charging Worked Example 1 Worked Example 2 Worked Example 3" skeleton. | Charts and three vehicle worked examples. |
| 48 | "6.1.6.6.1. Ride on Mowers asdsd" | Write the mower section (the brief says mowers are a worked example). |
| 48 to 50 | Figure 1 and Figure 2 referenced and captioned; charts not in extract. Caption p49 reads "popular petrol and ATV models" (should be "petrol and electric ATV models"). | Confirm charts present; fix caption. |
| 52 | 6.1.7 Case study: Ōnuku Marae, five-bullet skeleton. | Write. |
| 53 | "6.2.2. Marae profiles Charts showing yearly emissions before & after…" author note. | Convert. |
| 53 to 58 | 6.2.2.1 Quiet, 6.2.2.2 Average, 6.2.2.3 Larger: six empty chart slots. | Six charts. |
| 59 to 62 | 6.2.3.1 to 6.2.3.4 are heading-only pages. | Four charts plus a sentence each. |
| 63 | "[Qualitative explanation here on the difference in emissions between NZ grid and solar…]"; orphan caption "Figure 34: Medium SUVs vehicle comparison". | Write; renumber. |
| 64 | "6.2.3.6. Other machines For the power tools … alongside the economic benefits discussed in Section" (sentence stops); "6.2.3.6.1. Ride on Mowers asdsd"; "All-Terrain Vehicles (ATVs)" unnumbered, no body. | Write. |
| 65 | "6.2.5.2. Indoor EECA study on indoor air pollution, child asthma risk, etc."; "6.2.6. Case study:" empty. | Write. |
| 66 | "(source)" after Cyclone Gabrielle sentence. | Reference. |
| 67 | "6.3.0.1. It's (almost) always sunny in Aotearoa" (numbering); footnote "1 Thank you!" placeholder; "6.3.0.2. Mitigation and Adaptation" empty. | Renumber 6.3.1, write 6.3.2, replace footnote with UC acknowledgement. |
| 68 | Figure 60 caption contains a raw Felt URL. 6.3.1 Case study: Whakatu Marae skeleton. | Shorten caption, move URL to a footnote or QR. Write case study. |
| 69 | "Testimonial/quote.x v" stray characters; "INSERT IMPORTED ENERGY GRAPH". | Delete; chart. |
| 70 | "6.4.1. Case study: [name of marae]" skeleton; 6.5 is a bullet outline including "Dry year / hydro lakes?". | Write both. |
| 71 | "From the "Process" bit here? The Basics: Electric Marae" author note; "7.0.1", "7.0.2 Step 1" numbering. | Delete note; renumber 7.1 to 7.7. |
| 74 | "8.1 … In a pre-settlement context…" ellipsis, then a bare numbered list. | Write a sentence of framing. |
| 80 | 10. Conclusion empty. | Write. |
| 81 | 11. Glossary empty. | Write (list supplied in Section 3). |
| 82 | 12. Appendix 1: two bullets. | Write full assumptions. |
| 83 | 13. References empty. | Compile from every (REF)/(Ref)/(ref)/(source)/author-date in text. |
| 84 | 14. Secondary Resources is a working list ("Getting of Gas for Marae"). | Either describe the companion resources properly or cut. |
| 85 | 15. Information we need: internal list. | Cut from the public document. |
Counts for the tracker: 6 "[description]", 5 watercolour placeholders, 4 "Figure X" + 1 "Figure Y", 2 "Section X", 5 "(REF)" + 1 "(Ref)" + 1 "(ref)" + 1 "(source)", 2 "asdsd", 3 skeleton case studies, roughly 30 empty chart slots.
5.5.3.1 Low Marae Usage, 5.5.3.2 Medium Marae Usage and 5.5.3.3 High Marae Usage sit under "5.5.3 High usage" (which itself has "[description]"). They are clearly the generic descriptions of the three usage levels, and they also mix in size cues ("Small, used sparingly"; "Pan-iwi, multiple buildings"). Move them up to sit directly under 5.3 as "5.3.1 How we define usage" (three short paragraphs, one per level), before the Smaller/Larger split. Then 5.4.x and 5.5.x each carry a profile-specific "[description]" that references the usage definition rather than repeating it.
| Where | Size axis | Usage axis |
|---|---|---|
| Table 1 (p25) | Smaller / Larger | Low use / Medium use / High use |
| 5.4, 5.5 headings (p27 to 28) | Smaller marae / Larger marae | Low usage / Medium usage / High usage |
| 5.5.3.1 to 5.5.3.3 (p28 to 29) | implied Small / "Pan-iwi" | Low Marae Usage / Medium Marae Usage / High Marae Usage |
| 6.1.5.1 to 6.1.5.3 (p32 to 37) | none (North/South Island instead) | Quiet marae / Active marae / Constant use marae |
| p47 chart labels | none | Quiet marae / Average marae / Larger marae |
| 6.2.2.1 to 6.2.2.3 (p53 to 57) | none | Quiet marae / Average marae / Larger marae |
| Descriptor lines (p27 to 28) | "Low, predominantly weekends and tangihanga" / "Mid, staffed during the day…" / "High, activity seven days a week…" |
Two problems beyond naming. First, "Larger marae" is used as a size (5.5) and as a usage level (p47, 6.2.2.3), which makes it impossible to tell what the third emissions chart shows. Second, Table 1 defines six profiles as 2 sizes x 3 usage levels, but the chart sections define six as 3 usage levels x 2 islands with no size axis. These are different sets of six. The modelling team needs to confirm which set the charts actually present (brief says Smaller/Larger x Low/Medium/High, with NI vs SI heating as a variant, which would be twelve charts per benefit, not six).
Foreword (Marama Royal)
Acknowledgements and Steering Rōpū
About Rewiring Aotearoa
Contents
1 Executive summary (one page: the case, the numbers, the ask)
2 Introduction
3 Background and context
3.1 Mātauranga Māori and energy
3.2 The electric opportunity: Aotearoa-made energy
4 Marae in Aotearoa
4.1 Energy practices on marae
4.2 Why marae energy profiles differ
5 What is a fully Electric Marae?
5.1 Other buildings on marae
5.2 Current energy challenges for marae (5.2.1 to 5.2.6, each with "How marae can respond")
5.3 The six marae profiles used in this report
5.3.1 How we define usage (Quiet / Active / Busy)
5.3.2 How we define size (Smaller / Larger)
5.3.3 Benchmark regions (Table 2)
5.4 Smaller marae: Quiet, Active, Busy
5.5 Larger marae: Quiet, Active, Busy
6 Benefits
6.1 Economic benefits (6.1.1 upfront vs running; 6.1.2 lock-in; 6.1.3 stacking; 6.1.4 wider opportunities; 6.1.5 profile results; 6.1.6 per-machine results: space heating, water heating, cooktops, solar and batteries, vehicles, other machines)
Case study: Ōnuku Marae
6.2 Environmental benefits (6.2.1 emissions; 6.2.2 profile results; 6.2.3 per-machine results; 6.2.4 embodied emissions and circularity; 6.2.5 air quality outdoor and indoor)
Case study: [name]
6.3 Resilience benefits (6.3.1 marae as emergency hubs; 6.3.2 solar and batteries in an outage; 6.3.3 it is almost always sunny; 6.3.4 mitigation and adaptation)
Case study: Whakatū Marae
6.4 Mana motuhake through energy sovereignty
6.5 Contribution to the national energy system
7 Getting started: six steps (7.1 to 7.6)
8 Financing (8.1 what exists; 8.2 what needs to exist; 8.3 policy)
9 How do we make this happen? (9.1 advocacy; 9.2 direct support; 9.3 investing)
10 Conclusion: the Electric Marae
Glossary
Appendix 1 Methodology and assumptions
References
Dropped from the public document: section 14 (working list of companion resources, unless rewritten as "Companion resources") and section 15 (internal to-do list). Case studies are pulled out of the decimal numbering so they can be designed as feature spreads.
Recommend two axes with vocabulary that cannot be confused with each other:
Profile names: "Smaller Quiet marae", "Smaller Active marae", "Smaller Busy marae", "Larger Quiet marae", "Larger Active marae", "Larger Busy marae". Each chart is then labelled by profile plus "North Island" or "South Island" conditions.
Why not the alternatives: "Average" implies a statistical mean and clashes with the national-average assumptions; "Larger" as a usage word collides with the size axis; "Constant use" does not work as an adjective in a label; "Low/Medium/High use" is fine but flat, and Table 1 can keep those words in a sub-row ("Quiet (low use)") so the modelling labels still map. If the team prefers Low/Medium/High everywhere, that is acceptable as long as it is used everywhere, including chart titles and the TOC.
Exact text, page, fix. Trivial mechanical errors are grouped at the end of each block.
| Page | Text | Fix |
|---|---|---|
| 1 | "Kiritapu Allen" | "Kiritapu Allan" (p3 and the brief have Allan). |
| 7, 8, 8, 15 | "hāpu" | "hapū" (four instances). |
| 75 | "hapu and marae" | "hapū and marae". |
| 8 | "Papatuanuku" | "Papatūānuku". |
| 18 | "papatūānuku" | "Papatūānuku" (proper noun). |
| 15, 17 | "kaumatua" | "kaumātua". |
| 15 | "purakau" | "pūrākau". |
| 15 | "maara kai" | "māra kai" (p48 already uses this). |
| 10 | "tengahere" | "te ngahere". |
| 18 | "te aohurihuri nei" | "te ao hurihuri nei". |
| 9 | "Tama nui te rā", "tāne mahuta" | "Tamanuiterā", "Tāne Mahuta" (atua names capitalised; drop "etc."). |
| 18 | "lectricity prices have risen sharply" | "electricity". |
| 12 | "facilitiesthat" | "facilities that". |
| 15 | "the siteto hold" | "the site to hold". |
| 17 | "function well:the wharenui" | "function well: the wharenui". |
| 24 | "these profiles.In addition" | "these profiles. In addition". |
| 25 | "Breakfast/Lunch/DInner" (twice) | "breakfast, lunch and dinner". |
| 39 | "gas counterpounts" | "gas counterparts". |
| 39 | "They' ve been tested" | "They've been tested". |
| 39, 40 | "a heat pump ." / "a hot water heat pump ." | Remove space before full stop. |
| 65 | "exposed to atleast one" | "at least". |
| 66 | "as many as four hazards at one" | "at once". |
| 66 | "directly in harms way" | "harm's way". |
| 66 | "among the msot exposed" | "most". |
| 66 | "marae and parakainga" | "papakāinga". |
| 66 | "enables a marae tp generate" | "to generate". |
| 65 | "Te Tairawhiti and Te Matau a Maui" | "Te Tairāwhiti and Te Matau-a-Māui". |
| 66 | "the Bay Of Plenty" | "the Bay of Plenty". |
| 65 | "civil defense status" | "civil defence". |
| 22 | "Aging Buildings" (heading), "the aging infrastructure" | "Ageing" (NZ English; body text on p22 already uses "ageing"). |
| 67 | "how it can be complimentary" | "complementary". |
| 67 | "many weeks worth" | "many weeks' worth". |
| 69 | "declining sharply through sharply the coming decade" | "declining sharply through the coming decade". |
| 69 | "heat,mowing lawns" | "heat, mowing lawns". |
| 69 | "Testimonial/quote.x v" | Delete stray "x v". |
| 76 | "change in Government polic Make your next decision" | "policy." then new paragraph. |
| 75 | "the runanga are" | "the rūnanga are". |
| 84 | "Getting of Gas for Marae" | "Getting off gas". |
| 51 | "leafblowers" | "leaf blowers". |
| 25 | "6kw", "30KW", "560sqm", "1300sqm", "m2" | "6 kW", "30 kW", "560 m²", "1,300 m²", "m²". |
| 64 | "120kWh" | "120 kWh". |
| 13 | "Figure 5 New Zealandʼs" | Wrong apostrophe character; use the same curly apostrophe as the rest of the document. |
| Page | Text | Fix |
|---|---|---|
| 7 | "Put simply, running the machines that power your…" | Fragment. Finish the thought or cut. |
| 7 | "Rewiring Aotearoa's previous reports; Electric Homes and Vehicles, Electric Farms and Investing In Tomorrow, have demonstrated" | "Rewiring Aotearoa's previous reports, Electric Homes and Vehicles, Electric Farms and Investing in Tomorrow, have shown". Semicolon is wrong; "in" lowercase. |
| 8 | "reduce our whānau reliance on fossil fuels, rangatira are fulfilling their role as kaitiaki and return to a spirit of kinship" | "reduce our whānau's reliance … and returning to a spirit of kinship". |
| 12 | "Whereas solar energy generated on-site and stored in batteries can keep essential loads running" | Sentence starts with "Whereas" and has no main clause. "By contrast, solar energy generated on site …". |
| 13 | "produce far less emissions" (also p53 "magnitudes less") | "far fewer emissions" / "orders of magnitude lower". |
| 16 | "So while a rural marae are more likely impacted by power it barely uses, urban marae are more likely impacted by the cost of power given its higher use." | "So a rural marae is more likely to be hit by losing the power it barely uses, while an urban marae is more likely to be hit by the cost of the power it uses heavily." |
| 16 | "It also offers a challenge for those building energy infrastructure" | "poses a challenge". |
| 17 | "Where an Electric Marae has their own vehicle fleet" | "its own". |
| 18 | "There are three main components to a power bill; The wholesale energy charge" | Colon, lowercase "the". |
| 18 | "are not subjected to competition" | "are not subject to competition". |
| 19 | "Whilst New Zealand's highly renewable grid will deliver a lower cost of energy than fossil fuel energy sources (gas, petrol, diesel), adding onsite solar to a marae will reduce the impacts" | "Whilst" sets up a contrast that never arrives. "Grid electricity already costs less than gas, petrol or diesel for the same job. Adding on-site solar goes further and shields a marae from rising grid prices." |
| 20 | "Staying grid-connected allows a marae to size its system around everyday use, where the investment pays for itself, allows a marae to contribute its excess energy" | Missing "and": "…pays for itself, and lets it contribute…". Split the sentence. |
| 20 | "Marae are not businesses. They often operate as charitable or community trusts not necessarily as commercial entities." | "…community trusts, not as commercial entities." |
| 21 | "pushing the effect cost per unit of gas well above" | "effective cost". |
| 22 | "occurs at great expense" | "comes at great expense". |
| 26 | "three different benchmark region" | "regions". |
| 26 | "if your marae is in the Bay of Plenty, the region that is closest in terms of heating needs is probably Auckland. This is because a colder region like Southland will currently be paying more…" | "This is because" does not follow. Split: the Southland sentence explains why colder regions save more, not why BoP maps to Auckland. |
| 28 | "A step up in size and activity, with some sort of Cooking and hot water still run on gas" | Broken. "A step up in size and activity. Cooking and hot water still run on gas; lighting, appliances and office equipment run on grid electricity." |
| 29 | "The ma" | Fragment. |
| 29 | "Pan-iwi, multiple buildings and services under one roof" | Multiple buildings cannot be under one roof. "Pan-iwi, with multiple buildings and services on one site". |
| 31 | "a marae, many of whom have run on koha" | "many of which". |
| 32 | "Public EV charging is another economic opportunity with most marae are already sitting on exactly what it needs." | "…opportunity, and most marae are already sitting on exactly what it needs." |
| 32 | "Marae are already set up for the creation of SME with land, buildings" | "Marae already have what a small enterprise needs: land, buildings, capacity and a community of people." |
| 32 | "under a fixed, falling one" | A bill cannot be both fixed and falling. "under a stable, lower one". |
| 47 | "Petrol and diesel vehicles are majorly inefficient" | "far less efficient". |
| 48 | "surrounding whenua that needs maintenance" | "that need maintenance" (or "grounds that need"). |
| 48 | "may not pay itself off in terms of cost" | "may not pay for itself". |
| 48 | "These savings numbers do not include emissions pricing, which are shown" | "which is shown". |
| 51 | "have less vibrations" | "vibrate less". |
| 51 | "are considerable particularly in a marae environment" | comma after "considerable". |
| 53 | "Each of these fossil fuel machines produce emissions" | "produces". |
| 53 | "Heating, hot water and cooking commonly rely on LPG or gas, marae may use diesel generators for backup power, and vehicles typically are fuelled" | Comma splice. Use semicolons or split. |
| 53 | "The emissions profile of a marae, as it pertains to their energy use" | "its energy use". |
| 53 | "The more of a marae's own energy comes from its own solar and batteries" | "The more of a marae's energy that comes from its own solar…". |
| 64 | "one that sits in real contrast to the fossil fuel economy runs" | "to the way the fossil fuel economy runs". |
| 64 | "alongside the economic benefits discussed in Section" | Sentence stops. |
| 65 | "open their doors, taken in the displaced and hold their communities together" | "take in". |
| 65 | "We are now seeing marae as formal civil defence hubs for communities which is not a new role, and even those without…" | Two ideas in one sentence. "Marae are now formally recognised as civil defence hubs. The role is not new. Even marae without official status open their doors…". |
| 66 | "We see this time and time again In the meantime, help from outside" | Missing full stop after "again". |
| 69 | "their impact are felt by marae" | "their impact is felt". |
| 69 | "that leaves marae exposed to costs and disruptions it has no role in" | "they have no role in". |
| 70 | "marae can generate their own energy, on its own whenua and on its own terms" | "on their own whenua and on their own terms". |
| 70 | "fuel that harms the taiao" | "te taiao". |
| 72 | "You should also account for your marae's vital role as a resilience hub during emergencies which is becoming more prevalent." | Dangling: emergencies or the role? "…resilience hub, a role that is called on more and more often." |
| 76 | "There are many regulatory bodies and legislation that govern this system." | "Many regulatory bodies and pieces of legislation govern this system." |
| 79 | "Some iwi are already major players in generation delivering both a long term return" | Comma after "generation". |
| 79 | "as well as affordably power industries that provide employment" | Missing full stop; also "affordably power" reads oddly: "and power local industries affordably." |
| 79 | "with rates as affordable as property" | Meaning unclear (lines charges? returns?). Rewrite. |
| Term | Variants found (page) | Recommended form | Notes |
|---|---|---|---|
| hapū | hāpu (7, 8, 8, 15); hapu (75); hapū (9 uses) | hapū | Macron on the ū, never the ā. |
| Papatūānuku | Papatuanuku (8); papatūānuku (18); Papatūānuku (2) | Papatūānuku | Capitalised, two macrons. |
| kaumātua | kaumatua (15, 17); kaumātua (5 uses) | kaumātua | |
| wharenui | whare nui (15); Whare nui (25); Whare Nui (25); wharenui (7 uses) | wharenui | One word, lowercase. Use "whare tupuna" only where the ancestral-house meaning is the point. |
| wharekai | Whare Kai (25 x3); whare kai (25, 42); wharekai (5 uses) | wharekai | One word, lowercase. |
| whare tipuna / tupuna | "whare tipuna" (15), "tupuna (ancestor)" (15) | whare tupuna / tupuna (sing.), tūpuna (pl.) | Both tipuna and tupuna are correct dialectally; be consistent. Check with the Steering Rōpū which form they prefer. |
| pūrākau | purakau (15) | pūrākau | |
| māra kai | maara kai (15); māra kai (48) | māra kai | Double-vowel orthography (maara) is Waikato-Tainui convention; the rest of the report uses macrons. |
| papakāinga | parakainga (66); papakāinga (7 uses) | papakāinga | |
| rūnanga | runanga (75); rūnanga (3 uses) | rūnanga | |
| Te Tairāwhiti | Tairawhiti (65); Tairāwhiti (75) | Te Tairāwhiti | |
| Te Matau-a-Māui | Te Matau a Maui (65) | Te Matau-a-Māui | |
| te ngahere | tengahere (10) | te ngahere | |
| te ao hurihuri | te aohurihuri nei (18) | te ao hurihuri nei | Gloss on first use ("the changing world"). |
| Tamanuiterā | Tama nui te rā (9) | Tamanuiterā | Atua name, capitalised. |
| Tāne Mahuta | tāne mahuta (9) | Tāne Mahuta | Capitalise. Drop "etc." after a list of atua. |
| mana motuhake | Mana Motuhake (TOC, 6.4 heading); Mana motuhake (8); mana motuhake (5 uses) | mana motuhake | Lowercase in running text. Headings in sentence case: "Mana motuhake through energy sovereignty". |
| marae | Marae mid-sentence (72 "aspirations for the Marae"; 25 "of Marae") | marae | Common noun, lowercase, invariant plural. |
| Electric Marae | Electric Marae (16); electric marae (5: pp8, 12, 24, 76, 76) | Electric Marae | Capitalise the defined concept, matching "Electric Homes" and "Electric Farms". Use "electric marae" only when the sense is literally adjectival and the concept is not meant; simplest is to capitalise all. |
| Whakahiko Ngā Marae | title (3 uses); "Whakahiko i te marae" (9) | Whakahiko Ngā Marae | The p9 phrasing is fine as a sentence but readers may think it is a different title. Consider "Whakahiko ngā marae, electrifying our marae". |
| iwi | "from within the Iwi" (15); "Iwi financed" (73) | iwi | Lowercase. |
| Civil Defence | civil defence (3); Civil Defence (1); civil defense (1) | Civil Defence (the agency or status); civil defence emergency (generic) | Never "defense". |
| Aotearoa-made energy | Aotearoa-made (4); Aotearoa made (2); Aotearoa Made Energy (70) | Aotearoa-made energy | Hyphenated compound modifier, lowercase. If this is meant as a campaign name (cf. Rewiring's NZ Made Energy), capitalise consistently and define once. |
| te taiao | te taiao (5); "the taiao" (70) | te taiao | Do not mix English and Māori articles. |
| Whakatū Marae | "Whakatu Marae" (68) | Whakatū Marae | Confirm with the marae; Whakatū (Nelson) normally carries the macron. |
| Ōnuku Marae | Ōnuku (52) | Ōnuku | Correct. |
| wahie | "wahia" (85, internal note) | wahie | "wahie" is firewood; "wāhia" means to break. Presumably firewood is meant. |
| Pou Take Ahuarangi, Rōpū, Tāwhirimātea, Ruāumoko, Mahuika, Tangaroa, Matariki, kōhanga reo, kura, kauta, kaimahi, rangatahi, tamariki, tangihanga, pōwhiri, paepae, wharepaku, tukutuku, whakapapa, tikanga, kaupapa, koha, manuhiri, whenua, rohe, motu, hapori, tauhokohoko, te ira tangata | consistent | keep | Correct as used. |
Italics and glossing. Do not italicise te reo Māori. It is an official language of Aotearoa New Zealand and current practice at RNZ, Te Puni Kōkiri, Stats NZ and in Rewiring's own reports is roman type. Gloss on first use only for terms a Pākehā government reader is unlikely to know: tauhokohoko (p10 glosses it, good), te ira tangata (p9), te ao hurihuri (p18), hapori (p66), whare tupuna (p15 glosses, good), paepae (p15 glosses, good), wahie, kauta (p15 does not gloss), māra kai, kaimahi (p16, unglossed), rangatahi (p32), hapori Māori. Do not gloss marae, whānau, hapū, iwi, kai, hui, mana, kaupapa, tangihanga, manaakitanga, kaitiakitanga, rangatiratanga, tikanga in running text; they belong in the glossary instead.
Glossary (section 11, currently empty) should contain two lists. Te reo: hapū, hapori, hui, iwi, kai, kaimahi, kaitiaki, kaitiakitanga, kauta, kaumātua, kaupapa, koha, kōhanga reo, kura, mana motuhake, manaakitanga, manuhiri, māra kai, marae ātea, mātauranga Māori, motu, paepae, papakāinga, pōwhiri, pūrākau, rangatahi, rangatira, rangatiratanga, rohe, rūnanga, tamariki, tangihanga, tauhokohoko, te ao hurihuri, te taiao, tikanga, tukutuku, tūpuna, wahie, wānanga, whakapapa, whānau, whanaungatanga, wharekai, wharenui, wharepaku, whenua. Technical: califont, COP (coefficient of performance), demand charge, distributed energy, dry year, embodied emissions, EV, GXP (grid exit point), heat pump, hot water heat pump, induction cooktop, kW / kWh / MWh, lines charges, LPG, MTRs (multiple trading relationships), peer-to-peer trading, reticulated gas, resistance heater, single-phase / three-phase, time-of-use pricing, V2G (vehicle-to-grid, two-way charging).
| Claim | Page and text | Conflict | Recommendation |
|---|---|---|---|
| Heat pump efficiency multiple | p10 "usually 2-4 times for heat pumps"; p10 "about 3–4 times the amount of heating"; p11 "three to four times more efficient"; p29 "2 to 4 times more efficient than gas or LPG heating"; p29 "A heat pump water heater runs at around 325% efficiency"; p39 "roughly three times more efficient"; p39 "at least twice as efficient even in extreme cold" | Four different framings for the same fact | Pick one headline ("three to four times") and use it everywhere. State the modelled COP once in the appendix. Replace "325% efficiency" with "delivers more than three units of heat for every unit of electricity". The "at least twice" cold-weather figure is fine as a floor if labelled as such. |
| EV efficiency multiple | p10 "around 3-5 times for electric vehicles"; p10 petrol "16%–25%" vs EV "87%–91%" (implies 3.5 to 5.7 times); p29 "EVs 2 to 4 times more efficient" | 2-4 contradicts 3-5 and the percentages | Use "three to five times" to match the percentages, or correct the percentages. |
| Lifetime emissions multiple | p13 LPG space heater "16x" more than a heat pump; p39 heat pumps "around ten times lower in emissions" | 16 vs 10 | Reconcile against the model. |
| 25% of emissions | p13 "25% of Aotearoa New Zealand's emissions can be linked back to small fossil fuel machines" (all small machines: cars, heaters, cooktops etc.); p65 "these small machines that power our lives [mowers, chainsaws, weed eaters] are responsible for 25% of Aotearoa's gross emission" | p65 attributes the whole 25% to garden tools in context | On p65 say "small fossil fuel machines of all kinds, from cars to califonts, account for around a quarter of Aotearoa's gross emissions, and garden tools are part of that". Cite the Machine Count. |
| Grid renewable share | p13 "already highly renewable grid"; p53 "around 85% renewable"; p13 Figure 5 note "only around 30% is renewable energy" | 85% vs 30% looks like a contradiction to a lay reader (electricity vs total energy) | Every time, say which: "electricity is around 85% renewable; total energy, including transport and industrial fuels, is only around 30% renewable". |
| Fossil share of total energy | p13 "around 70% of the country's energy profile is made up of fossil fuels"; p69 "Around two-thirds of New Zealand's total energy comes from fossil fuels" | 70% vs 67% | Pick one figure and cite MBIE Energy in New Zealand. |
| Gas connection charge | p21 "around $2 a day … (around $720 a year)"; p42 "around $800 per year for a typical residential home" | $720 vs $800 (and $2 x 365 = $730) | One figure, one source. |
| Grid electricity price | p19 "$0.26–$0.40/kWh delivered"; p26 benchmark table "25 c/kWh, 30 c/kWh, 27 c/kWh"; p30 "20 to 30 cents for what you'd otherwise pay" | Three ranges that only partly overlap | State the modelled range once (appendix) and refer to it. |
| Benchmark table labels | p26 Auckland "$1043 per year (on the lower end)"; Waikato "$997 per year (on the higher end)"; Canterbury "$834 per year (on the lower end)" | The highest dollar figure is labelled "lower end" | Check whether the labels refer to the c/kWh or the fixed charge, and label the right column. |
| ATV usage hours | p48 "moderate usage of around 4 hours a week, 6240 hours a year" | 4 h/week is 208 h/year. 6,240 is 8 h/week over 15 years, or 4 h/week over 30 years | Correct to "around 4 hours a week, roughly 3,100 hours over a 15-year life" (or whatever the model used). |
| Distance of geopolitical events | p69 "While these events happen hundreds of thousands of kilometres away" | Nothing on Earth is more than about 20,000 km away | "tens of thousands of kilometres away" or "on the other side of the world". |
| Imported energy | p13 "over 50% is imported"; p69 "most of it imported" | Consistent but both unreferenced | Cite. |
| Solar system cost | p19 "A typical residential 9kW solar system, costing around $21,900 over its 30-year life" | Reads as if $21,900 is the lifetime cost; presumably it is the installed cost | "A typical 9 kW residential system installed for around $21,900 produces electricity over its 30-year life at…". |
| Vehicle multiplier wording | p10 "2-4 times for heat pumps, 2-3 times for induction cooktops" vs p29 same figures | Consistent for cooktops | No change. |
| $20 billion a year = $55 million a day | p69 | 20bn / 365 = $54.8m | Fine. |
| Chainsaw price premium | p51 "10% to 15% more" vs "$900 … $1000" | $1,000 is 11% more | Fine. |
p13 cooktop 6x, water heater 13x, space heater 16x lifetime emissions; p13 EV operating emissions "more than 85%"; p15 Tapsell quotation (source and year); p18 OECD 2026 Economic Survey quotation (page); p21 gas reserves 27% lower, production down 20%, MBIE quotation; p21 Vector no new residential connections after 2028; p21 solar overtaking gas in California and Australia; p29 10.2 million machines, 84% Ready; p30 buy-back rates 8 to 17 c/kWh; p32 NES-ETA proposed change and 10,000 chargers by 2030; p48 Honda, eTuatara, Polaris, HDK model prices; p64 panel recovery 90%+, Phoenix Metalman 98%, batteries 70 to 80% capacity, Counties Energy and Relectrify, lithium recovery 90%+; p65 760,000 / 150,000 / 75,000 tonnes; p65 and p66 Vercoe 2025 and Awatere 2025 (full references); p66 January 2026 Te Tai Tokerau floods and Cyclone Vaianu, April (year); p67 UC solar irradiance analysis and hydro storage "many weeks"; p69 Rewiring Aotearoa 2025 and MBIE 2025; p69 strategic diesel reserve and Strait of Hormuz tanker traffic; p77 Māori Climate Platform "more than sixty marae" and its wind-down.
| Page | Opening words | Approx. words | Suggested split |
|---|---|---|---|
| 16 | "Many marae in this position choose to invest in a petrol or diesel generator, which also comes with inherent vulnerabilities…" | 65 | Three sentences: the choice; the compounding failure; the result. |
| 16 | "Then a tangihanga arrives, and for three or four days that same marae runs in fifth gear at its absolute full potential…" | 45 | Cut "at its absolute full potential" (doubles "fifth gear"). |
| 20 | "Staying grid-connected allows a marae to size its system around everyday use…" | 50 | Two sentences. |
| 22 | "Alongside it, and often filling the gaps it leaves, marae have continued to rely on what has always sustained them…" | 55 | Two sentences; the list of examples becomes its own sentence. |
| 30 | "Replacing like for like, a new gas califont for the old one, another petrol mower…" | 65 | Three sentences. |
| 30 | "A marae that installs solar but keeps cooking on gas and heating water with LPG only ever gets to sell its surplus…" | 60 | Split before "and buy-back rates". |
| 31 | "Marae can accelerate that further directly, by making low or no cost EV charging available…" | 50 | Two sentences. |
| 65 | "We are now seeing marae as formal civil defence hubs…" | 50 | See 2.2. |
| 66 | "National research assessing the natural exposure of marae found that two-thirds…" | 55 | Move the three statistics to a short list or a pull-out. |
| 77 | "Marae should also be able to share the power they generate without facing a wall of regulatory burden…" | 50 | Two sentences. |
| 78 | "More durable still is the creation of funding pathways that whānau can draw on over time, whether a revolving fund…" | 60 | Lead sentence plus a three-item list. |
Paragraph length: 6.1.1 (p29) is a single paragraph of around 330 words; 6.3 (p66) around 250; 9.1 "Set fair rules" (p77) around 200. For a marae committee reader, break at every change of idea and aim for 60 to 100 words.
| Term | First use | Gloss |
|---|---|---|
| EV | p7 | "electric vehicle (EV)". |
| califont | p12 | "califonts (instant gas water heaters)". |
| V2G / two-way charging | p12 (glossed), p66 (different name) | Use one name: "vehicle-to-grid (V2G), or two-way charging". |
| peak demand charges, high-user tariffs | p16 | p20 explains demand charges well; move that one-line definition to p16 or forward-reference it. |
| lines charges | p18 | Glossed; fine. |
| three-phase | p18 | "three-phase power (the heavier-duty supply commercial kitchens need)". |
| reticulated gas | p21 | "piped natural gas (reticulated gas)". |
| residual-classified connections | p21 | Plain term needed; most readers will not know it. |
| COP / "325% efficiency" | p29 | See 4.1. |
| buy-back rate | p30 | "the rate a retailer pays for exported solar". |
| NES for Electricity Network activities, permitted activity | p32 | "would let marae install public chargers without a resource consent". |
| GXP | p67 | "grid exit point (GXP), the substation where the national grid hands over to the local network". |
| irradiance | p67 | "sunlight". |
| AF8 | p70 | "an Alpine Fault earthquake (AF8)". |
| MfE, MBIE, RIF, MPI, TPK, EECA, DoC | p75 | Spell out each once; TPK is Te Puni Kōkiri, RIF is the Regional Infrastructure Fund. |
| Multiple Trading Relationships, peer-to-peer trading | p77 | One sentence each. |
| distributed energy, dry year, embodied emissions, time-of-use pricing, inverter | various | Glossary. |
Marae are the beating heart of Māori communities, and energy underpins everything they do: a warm wharenui, hot showers for manuhiri, a kitchen that can feed hundreds at short notice, and shelter when disaster strikes. Today most marae buy that energy as LPG bottles, petrol, diesel and grid electricity, and all four are getting more expensive. This report shows a better path. An Electric Marae replaces its fossil fuel machines with efficient electric ones, adds solar and batteries where it can, and stays connected to the grid for the big days. Across six composite marae profiles, modelled for North Island and South Island conditions, the electric option costs less over its working life than the fossil fuel machine it replaces, cuts emissions by [X]%, and keeps the lights, the kitchen and the hot water running when the grid goes down. The savings are largest when solar and electric machines are installed together, because the marae uses the power it makes instead of selling it for a fraction of what it pays to buy it back. The barrier is not willingness but upfront cost. So this report sets out a six-step pathway for marae committees, the funding and finance available today, and the changes the Government and the energy sector should make so that every marae in Aotearoa that wants to become an Electric Marae can do so. Whakahiko ngā marae, electrifying our marae, is an act of mana motuhake, manaakitanga and kaitiakitanga. It also stacks up economically.
(Insert the headline savings and emissions figures once the modelling is final. Keep the paragraph under 250 words.)
An Electric Marae no longer relies on fossil fuels. Every machine that once burned gas, LPG, petrol, diesel, coal or wood, whether for heating rooms, heating water, cooking, driving or mowing, has been replaced with an electric equivalent. Where it can, an Electric Marae also generates and stores its own power with rooftop solar and batteries, the cheapest and most resilient energy available in Aotearoa. It stays connected to the grid, drawing on it during the big days and exporting surplus the rest of the year. If the marae runs vehicles, they are electric too, and it may host chargers for its fleet and for whānau. Depending on its size, an Electric Marae can share power with neighbouring papakāinga and act as a local energy hub. Becoming fully electric, rather than swapping one fossil fuel for another, is the surest route to real energy independence and resilience. We believe every marae in Aotearoa should have the opportunity to get there.
(Original: three paragraphs, 190 words, with "their" for "its" and the resilience point separated from the definition. Rewrite: one paragraph, 150 words.)
Reviewer role: Illustration and data-visualisation director Date: 2026-10-06 Inputs: 85-page draft render, cleaned text, Google Doc planning notes, Rewiring 2026 palette and the three illustration directions trialled this year.
| Page | What is there | What is wrong |
|---|---|---|
| p01 cover | AI watercolour of a wharenui (red maihi, implied koruru and carving) beside a wharekai with solar on its roof. Title in default sans, Rewiring logo, authors list with a Google Doc chip. | Generic and soft, reads as AI. Low contrast and pale, will print muddy. Wharenui carvings are implied with no permission or sign-off. No brand relationship to Electric Homes, Electric Farms or the 2026 palette. Panels correctly sit on the wharekai, which should be kept as a deliberate decision. |
| p11 Fig 6 | Google Sheets line chart: price index of consumer energy 2000 to 2026 (gas magenta, petrol red, grid blue, CPI grey, solar modules orange, battery cells yellow). | Default spreadsheet styling, light grey gridlines, direct labels OK. Colours arbitrary. Caption is "Figure 6" while the text says "Figure X". Highlighter yellow note in body. Body text sentence "While Figure X shows indices" has nothing above it to point at. |
| p12 Fig 52 | Line chart "Solar is now the cheapest form of energy per kWh": solar financed yellow, solar plus battery plus grid green, grid blue, LPG light blue, petrol red, natural gas magenta. | Good takeaway title. LPG in light blue sits next to grid electricity in blue and reads as "electric". Body copy names colours ("yellow line", "green", "blue"), which breaks the moment the chart is restyled. Same chart repeated as p45 in full. |
| p13 Fig 5 | Pie of NZ energy consumption 2024 with an "Imported energy" arc. Petrol and diesel in reds, renewable electricity blue, bioenergy and geothermal green, tiny slices for coal, LPG, aviation. | Nine slices with unreadable labels, caption floats to the right of the pie, legend absent. Reused from Electric Homes web donut. The one-sentence takeaway (over 50 percent imported, only 30 percent renewable) is buried in the caption. |
| p19 Fig 60 | Clip-art style strip: hydro dam, wind, coal stack, pylons, meter, house. 17c plus 3c plus 14c plus 6c equals 40c delivered vs rooftop solar 12c. | Rendered 3D clip-art clashes with everything else. Five pastel box colours carry no meaning. The two numbers that matter (40c vs 12c) are the same size as the parts. Figure number 60 is reused on p68. Tiny unreadable footnote. |
| p24 | Grey 2x3 dot grid, "Marae size" vs "Marae usage", no profile names. | Placeholder. This is the single most important navigation graphic in the report ("find your marae") and currently says nothing. Highlighter note below it. |
| p25 Table 1 | Spreadsheet table with grey, blue and peach row bands. | Row banding is colour without meaning. Cells contain modelling notes ("Unsure of assumption we can make here"). This belongs in the appendix; the body needs profile cards instead. |
| p26 | Benchmark regions table (Auckland, Waikato, Canterbury). | Plain Google Docs table. Fine as data, but the text refers to Figure X and Figure Y (heating needs, electricity price) that do not exist yet. |
| p27 Fig 19 | Grouped bars: regional heating needs, heat pump (blue) vs gas/LPG (purple) per region, national average in dark purple. | Rotated x labels, no benchmark regions highlighted, y axis "Average kWh/day" with no context. Chart of regional electricity prices below it is missing (highlighter). |
| p31 Fig 2 | Green waterfall "Savings per year on bills broken down by machine", $7,600 total. | This is the household waterfall (petrol SUV, petrol car). Placeholder for the marae profile 2 waterfall. All bars identical green so the stacking logic is lost. |
| p33 to p37 | Same two charts repeated: Fig 63 (stacked: gas bills mauve, electricity bills periwinkle, upfront grey, savings green) and Fig 67 (excl upfront). | Household data ("no cars", "New Zealand"). Repeated on every profile page and for both islands. Savings drawn as a third bar reads as a cost. Grey upfront segment dominates the electric bar visually and undercuts the message. No NI/SI difference shown. Section headings use "Quiet / Active / Constant use" while 5.3 uses "Low / Medium / High" and p47 uses "Quiet / Average / Larger". |
| p39 to p41 | Horizontal stacked bars per machine: yearly bills and upfront plus 15-year bills for space heating and water heating. Heat pump blue, wood tan, resistive light blue, gas pink, gas fire purple, LPG indigo, upfront black. | Household figures ("average New Zealand home"). Label collisions on the LPG rows ("$1,410 /yr" overprints "LPG costs daily"). Segment labels are 5pt white text. Fixed-charge segments and volume segments have no visual rule. Figures 20, 22, 24, 26 are Electric Homes numbers. |
| p45 | Duplicate of p12 chart, alone on a page. | Remove. |
| p46 Fig 53, 54 | Two line charts with dashed projections to 2040: EV vs petrol cost per useful kWh; HWHP vs LPG and gas water heater. | Good concept, inherited colours (petrol red, LPG purple, gas magenta, grid blue, solar yellow). Should move to the vehicles and water heating sections respectively, not sit under "Solar and batteries". |
| p47 | "Quiet / Average / Larger marae" headings with nothing beneath, then "Worked Example 1, 2, 3" empty. | Awaiting data. Naming conflict again. |
| p49 Fig 1 | ATV lifetime cost: stacked peach bars (upfront plus operating) with red emissions bars on a secondary axis. | Dual axis makes emissions look like a cost. Peach and red are both warm so petrol and electric models are indistinguishable by colour. Figure numbering restarts at 1. Emissions and cost should be two aligned charts, not one. |
| p50 Fig 2 | Six AI product renders of named models (Honda Pioneer, Polaris Ranger XP Kinetic, eTuatara, Hisun Sector E1, HDK golf cart) with exhaust clouds and lightning bolts, red strike-through prices. | Reads as a product endorsement and uses manufacturer trade dress. Renders may not match the real models. Honda Pioneer 700-2p is labelled twice (second should be 520-2P). Red used for "Lifetime cost" heading, strike-throughs and the petrol models. Tiny grey footnote. Replace with neutral doodle silhouettes plus a model table. |
| p53 to p58 | Emissions profile pages using the dollar charts from p33. | Wrong metric entirely. Placeholders. |
| p59 to p61 | Horizontal bars: yearly emissions for space heating, water heating, cooktop. Electric blue, wood tan, gas pink, LPG purple. | Household figures. Fine shape, wrong palette. Bars sorted inconsistently (water heating puts LPG below gas tank though it is lower). |
| p62 Fig 31 | Four small multiples of vehicle operating emissions (petrol dark red, HEV pink, BEV blue). | Axis scale differs between panels (2,500 vs 3,000) so bars are not comparable across panels. Otherwise a good pattern. |
| p63 Fig 32, 34 | Stacked lifetime emissions (reds) for five cars; then a cluttered dual-axis cost-plus-emissions chart for medium SUVs. | The author note asks for an emissions-only version of Fig 34. Fig 34 has overlapping labels and 4pt text. Keep Fig 32, rebuild Fig 34 as emissions-only. |
| p68 Fig 60 | Felt map screenshot: NZ with teal circles per GXP, "avg 1.8 / 5 max" labels, grey basemap. | Screenshot quality, labels unreadable at print size, legend 5 to 12 days contradicts the text ("about one week"). Redraw as a clean dot map with the two numbers that matter (average 2 days, worst week) and link the interactive version on the web page. |
| Throughout | Highlighter-yellow author notes, "[graphic ... labelled watercolour?]" placeholders, Google Doc chips. | Expected in a draft, but they signal where design placeholders are owed: p17, p21, p24, p27, p28, p29, p31, p43, p44, p47. |
General issues across all charts: default Google Sheets styling, light grey gridlines on white, no source line format, no units in axis titles on half of them, captions in italic blue, chart titles sometimes a takeaway sentence (good) and sometimes a label (not good). Tables are spreadsheet tables. There is no visual difference between a marae-scale machine (commercial six-burner, 30 kW ceiling heat pump) and the household machine the chart is actually showing.
Palette tokens are the Rewiring 2026 draft set. Colour carries energy-source meaning and nothing else.
| Meaning | Token | Hex | Mono print | Pattern rule |
|---|---|---|---|---|
| Fossil fuel (LPG, natural gas, petrol, diesel) | ink | #1f2727 | near black | Where fossil fuels must be told apart on one chart, step opacity on paper: LPG 100 percent, natural gas 75 percent, petrol 100 percent, diesel 75 percent, and always direct-label. Never add a second hue. |
| Wood and coal | ink, 55 percent | mid grey | Diagonal hatch. Rare, only on heating charts. | |
| Grid electricity | blue 300 | #7c96c1 | mid grey | Emphasis and lines: blue 500 #374568. |
| Rooftop solar (generated and self-used) | yellow 300 | #ffc754 | light grey | |
| Battery (stored solar, used later) | yellow 500 | #cc770a | mid-dark | Always hatched with yellow 300 so it survives mono. |
| Fixed charges (lines charges, gas connection, daily charges) | same as the energy colour | Dotted fill. Rule: dots mean "you pay this whether you use it or not". | ||
| Upfront cost and finance interest | mint 300 | #c2d0c4 | very light grey | Interest in mint 500 #527570. Neutral on purpose so capital never looks like a fuel. |
| Savings (any delta that is good) | good-green | #4cbc10 | Only ever a delta bracket, a big number, or a thin outline bar. Never a stacked segment. | |
| Emissions | bad-red | #da1919 | Only on emissions charts. Fossil-sourced emissions in bad-red, grid-electricity emissions in blue 300, solar in yellow 300. Red and green never appear on the same chart. | |
| "You are here" and annotation markers | emphasis-blue | #3378e9 | Benchmark region flags, "your marae" pins, callout arrows. | |
| Background | paper | #fdfaf1 | Charts have no border, no plot background, no vertical gridlines. Horizontal gridlines in mint 100 #e7efe8. | |
| Text, axes | ink | #1f2727 | Axis lines ink at 40 percent. |
Accessibility check: the working pairs are yellow vs blue (lightness contrast plus hue), charcoal vs blue (lightness), mint vs everything (very light). Deuteranopia and protanopia keep all of these apart. Red and green are never co-located. Mono print: charcoal, blue and yellow sit at roughly 14, 58 and 82 percent luminance, battery and fixed charges carry patterns, so the chart still reads in a black and white photocopy, which is how many marae committees will receive it.
Shared layout rules: - Before/After: before is always left or top ("Today: gas and grid"), after is always right or bottom ("Electric Marae: solar and battery"). Where there are four scenarios the order is fixed: Today / Electric on grid / Electric with solar / Electric with solar and battery. - Savings are shown as a green bracket between the tops of the two bars with a big number, or as a separate green big-number tile, not as a third bar. The current third-bar layout makes savings look like a cost column. - NI/SI: never by colour. Two panels side by side (A4 portrait) or stacked (web mobile), North Island left, South Island right, each labelled with a small island silhouette and the phrase "North Island (less heating)" / "South Island (more heating)". Shared y axis across the pair so the SI bar is visibly taller. - Six profiles: fixed order Smaller Low, Smaller Medium, Smaller High, Larger Low, Larger Medium, Larger High. Fixed profile glyph (from the vignette set) in the panel corner. One naming scheme only (recommend "Smaller / Larger" x "Low use / Medium use / High use", since that is what Table 1 uses; drop Quiet/Active/Constant and Quiet/Average/Larger). - Title = the takeaway sentence in ink, 15pt. Subtitle = what is measured and the unit, 9pt. Source line, 7.5pt, format: "Source: Rewiring Aotearoa Marae Electrification Model 2026. Prices as at [month] 2026, 15-year lifetime, [x] percent finance. Excludes vehicles." Figure caption below in ink 9pt regular, not italic blue: "Figure 12. Smaller marae, medium use: yearly energy bills before and after electrification." - Direct labels on lines and bars, legends only when there are more than four series. Big number for the one value the reader should take away, in ink 24pt, placed inside the plot. - Annotations: short ink text with a thin ink leader, hand-drawn feel allowed for the web version only (the doodle line). Print uses straight leaders. - Numbers: round to two significant figures in the plot ($1,300, 4.2 t). Precise values live in the appendix tables. - Build once: every chart generated from a JSON file (one per figure) through one renderer (Recharts for web, exported SVG into the print layout). When Jenny updates a number, the chart regenerates and no one redraws anything. The existing figma-chart pipeline and the Electric Homes Recharts build both work as starting points.
Numbering below is proposed final numbering. "Data" says what Jenny needs to supply. "Now" means OJ can build from existing public data.
Section 3: Background and the electric opportunity
| No. | Purpose (the one sentence) | Type | Data | Colours |
|---|---|---|---|---|
| F1 | Fossil fuel prices have risen faster than inflation while solar and battery prices have collapsed. | Multi-line index chart 2000 to 2026, indexed to 1. | Existing (Stats NZ CPI, Our World in Data, BloombergNEF). Now. | Gas and petrol ink (two opacities), grid blue, CPI mint 500, solar yellow 300, battery yellow 500. |
| F2 | Solar is now the cheapest energy per kWh, even financed, and a solar plus battery plus grid mix beats grid alone. | Multi-line, $/kWh 2000 to 2026, direct labels. | Existing. Now. Remove duplicate on p45. | Solar yellow 300, solar plus battery plus grid yellow 500, grid blue 300, LPG and natural gas ink at two opacities, petrol ink dashed. |
| F3 | Over a 15-year life each fossil machine emits many times more than its electric replacement. | Small lollipop or paired-bar set: cooktop 6x, HPHW 13x, heat pump 16x, EV >85 percent less. | Multipliers in the text. Jenny to confirm the lifetime kgCO2e behind each. | Fossil bad-red, electric blue 300. |
| F4 | Over half of New Zealand's energy is imported and only about 30 percent is renewable. | Donut with an outer "imported" arc, four to five slices maximum. | Existing (MBIE 2024). Now. | Fossil ink opacities, renewable electricity blue, bioenergy and geothermal mint 500. Imported arc emphasis-blue. |
Section 4: Marae in Aotearoa
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F5 | Two marae can look identical on paper and have completely different energy shapes. | Two small 12-month load sparklines: constant-use marae (flat, workplace-like) and event-driven marae (near zero with three tangihanga spikes). | Jenny: modelled weekly kWh for the Smaller Low and Larger High profiles. | Ink line, spikes annotated "tangihanga, 3 days". Peak-demand line in emphasis-blue dashed. |
| F6 | One weekend of manaakitanga can set the demand charge for months. | Daily demand line for one month with the single 30-minute peak flagged and the resulting tariff threshold. | Jenny or a real bill from a participating marae (anonymised). | As F5. Could merge with F5 on the web. |
Section 5: What is a fully Electric Marae
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F7 | This is what a fully Electric Marae looks like. | Labelled diagram (illustration, see 3b). | None. Now. | Doodle style, paper background. |
| F8 | Of the 40c you pay for a grid kWh only 17c is the energy, and rooftop solar skips the rest. | Horizontal stacked bar (generation 17, transmission 3, distribution 14, retail 6 = 40c) above a single yellow bar (rooftop solar 12c), with four small doodle icons. Replaces the clip-art strip. | Existing. Now. | Grid blue 300 with the three non-energy segments dotted (fixed), solar yellow 300. |
| F9 | Gas is getting scarcer and dearer at the same time. | Two small panels: NZ gas production 2011 to 2026 (line) and residential LPG price index 2019 to 2026. Or a single big-number trio (reserves down 27 percent, production down 20 percent, prices up 20 percent). | MBIE, Stats NZ. Now, pending author choice of panels vs big numbers. | Ink lines. |
| F10 | Find your marae: six profiles on a usage vs footprint grid. | 2x3 grid with a vignette glyph, name, one-line description, two key numbers per cell (yearly energy kWh, yearly bill today). Reused as a navigation strip on every profile page and on the one-pager. | Jenny: kWh and bill today per profile. Layout now, numbers later. | Glyph in ink, selected cell in yellow 100. |
| F11 | Colder regions have higher heating needs, so their savings are larger. | Sorted horizontal bar of heating need (percent of national average) per region, the three benchmark regions flagged. Web version: NZ region map. | EECA regional heating hours (existing, p27). Now. | Bars ink 55 percent, benchmark flags emphasis-blue. |
| F12 | Grid prices vary by region but matter less than the gas-to-electric switch. | Same layout as F11: c/kWh plus yearly fixed charge per network region. | Jenny: per-region prices used in the model. | Bars blue 300, fixed-charge portion dotted. |
| F13 | Marae profile cards (six). | Six illustrated vignettes with the Table 1 facts rewritten as plain-language cards (buildings, m2, heaters, hot water, cooktops, usage pattern, roof area). Table 1 itself moves to the appendix. | Table 1 content. Jenny to confirm solar roof-space assumption (25 percent of roof). | Doodle style. |
Section 6.1: Economic benefits
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F14 | The price tag is only half the bill. | Simple two-column "sticker price vs 15 years of fuel" for one machine (LPG califont vs HPHW). | Jenny per-machine lifetime. | Upfront mint, running ink vs blue. |
| F15 | Savings stack as you electrify more machines. | Waterfall for Smaller Medium (NI): today's bill, then heat pump, HPHW, induction, gas disconnection, solar, battery, total saving. | Jenny: incremental saving per step for that profile. | Steps in good-green outline, final bar green fill, baseline ink. |
| F16.1 to F16.6 | Each profile: yearly bills today vs electric, with and without solar and battery, NI and SI. | One component per profile: two panels (NI, SI), four stacked bars each (Today / Electric on grid / Electric plus solar / Electric plus solar plus battery). Row A excludes upfront, Row B annualises upfront. Green bracket shows saving vs Today. | Jenny: the 6 x 2 x 4 matrix (bill, bill plus upfront). This is the core data set. | Gas ink, grid blue 300, fixed charges dotted, upfront mint 300, interest mint 500, solar self-use yellow 300 (shown as a negative or as the gap), savings good-green bracket. |
| F17 | Space heating: heat pump is cheapest per year and over 15 years. | Paired horizontal bars at marae scale (30 kW ceiling heat pumps vs LPG burners, wood, resistive): yearly bill, then upfront plus 15-year. | Jenny: marae-scale machine costs. Household version exists as fallback. | Electric blue 300, LPG and gas ink, wood hatched, upfront mint. |
| F18 | Water heating: HPHW beats califonts. | As F17, plus the p46 "cost per useful kWh of hot water" line chart moved here. | Jenny. | As F17. |
| F19 | Cooktops: small bill saving, big saving if it lets you disconnect gas, and 3-phase may be needed. | As F17 plus a callout for the $800/yr gas connection and the $10,000 3-phase caveat. | Jenny. | As F17. |
| F20 | Buying energy keeps getting dearer, making it keeps getting cheaper. | Re-use F2 cropped to 2015 to 2026 with the two lines that matter. | Existing. | Grid blue, solar yellow. |
| F21 | Solar system options for marae (small and large, roof and ground). | Four option cards: install cost, MWh/yr, "equivalent to x homes", saving at 50 percent self-use. | Jenny. | Cards in yellow 100. |
| F22 | Your region's sun: scale the solar numbers up or down. | Sorted bar or map of annual kWh per kW installed by region. | NIWA / existing RW solar data. Now. | Yellow 300. |
| F23.1 to F23.3 | Vehicle worked examples (kaumātua van, ute, car). | Each a card: yearly fuel vs charging cost (grid and solar), upfront, 15-year lifetime, payback year. Plus the p46 EV cost-per-useful-kWh line as a shared intro. | Jenny: three vehicle examples. | Petrol and diesel ink, grid-charged blue, solar-charged yellow, upfront mint. |
| F24 | Ride-on mowers: lifetime cost. | Same paired-bar component as F17. | Jenny (section currently "asdsd"). | As F17. |
| F25 | ATVs: most electric models cost less over 15 years; a premium one may not. | Two aligned horizontal charts: lifetime cost (upfront mint plus running, fuel coloured) and lifetime emissions (bad-red), no dual axis. Plus a plain model table (range, towing, upfront, 15-year) with neutral doodle silhouettes. Removes the product renders. | Existing (p49) with the 700-2P label fixed. Now. | As stated. |
| F26 | Chainsaws cost about 10 percent more upfront. | Big-number pair ($900 vs $1,000) with a note on shared batteries. | Existing. Now. | Ink. |
| F27 | Case study before/after (template, used three times). | Mini pair: bill before and after, emissions before and after, timeline of what was installed when. | Case study data (Ōnuku, Whakatu, third). | Standard system. |
Section 6.2: Environmental benefits
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F28.1 to F28.6 | Each profile: yearly emissions today vs electric, NI and SI. | Same component as F16 with the metric switched to tCO2e. Four bars or two, author's call. | Jenny: emissions per profile per scenario. | Fossil bad-red, grid blue 300, solar yellow 300. Reduction as a percentage big number in ink (not green). |
| F29 to F31 | Per-machine emissions: space heating, water heating, cooktop. | Horizontal bars sorted high to low. | Jenny marae-scale; household fallback exists. | As F28. |
| F32 | Vehicle operating emissions by class. | Four small multiples with one shared axis. | Existing (p62). Now, fix axis. | As F28. |
| F33 | Over a lifetime an EV's higher manufacturing emissions are dwarfed by avoided fuel. | Stacked bars (manufacture, battery, operating). | Existing (p63 Fig 32). Now. | Operating bad-red, manufacture ink 55 percent, battery ink 35 percent. |
| F34 | Charging from solar cuts emissions further than charging from the grid. | Emissions-only version of p63 Fig 34: five charging scenarios. | Existing data, re-cut. Now. | As F28. |
| F35 | Panels and batteries are recovered, not dumped. | Three big numbers with icons (over 90 percent panel recovery, 70 to 80 percent battery capacity for second life, 90 percent of lithium recovered). | Existing text. Now. | Ink with mint icons. |
| F36 | Indoor air: gas cooking and child asthma. | Pending EECA content; likely one big number. | Authors. |
Section 6.3: Resilience
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F37 | Two-thirds of marae are exposed to at least one major hazard. | Waffle of 100 marae pictograms: flood 45, shaking 40, exposed to any 67. | Vercoe 2025. Now. | Pictograms ink, exposed in emphasis-blue. |
| F38 | Low-sun spells are short: about two days on average, a week at worst. | Clean NZ dot map by GXP, dot size = max consecutive low-sun days, two big numbers beside it. Web: embed the Felt interactive. | Existing Felt data (UC). Now. | Dots blue 300 to blue 500, paper map in mint 100. |
| F39 | What a solar plus battery marae keeps running in an outage. | Horizontal timeline: hours of backup for lights, fridges, comms, medical, heating, kitchen, for one profile. | Jenny: battery size and essential load for one profile. | Blue 300 bars, yellow recharge band for daylight. |
Section 6.4: Mana motuhake
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F40 | Every litre reaches a marae at the end of a long, fragile chain. ("INSERT IMPORTED ENERGY GRAPH") | Illustrated supply-chain strip: oil field, overseas refinery, tanker, NZ terminal, truck, marae gas bottle, with the $20 billion a year / $55 million a day big numbers. Pair with a cross-reference to F4. | Existing. Now. | Doodle style, ink line, one yellow blob on the marae end. |
Sections 7 to 9
| No. | Purpose | Type | Data | Colours |
|---|---|---|---|---|
| F41 | The six steps to an Electric Marae. | Journey graphic (see 3f). | Text. Now. | Doodle. |
| F42 | Where the money can come from, before and after settlement. | Two-column matrix of funding sources. | Text. Now. | Mint 100 panels. |
| F43 | Three levers: advocate, support directly, invest. | Three-tile diagram, each with one doodle icon. | Text. Now. | Doodle. |
Front matter and summary
| No. | Purpose | Type | Data |
|---|---|---|---|
| ES1 | Executive summary big numbers: typical yearly saving per profile, emissions cut, payback. | Big-number row plus the F10 grid. | Jenny. Blocked until modelling lands. |
| Cover, section openers x9, machine icon set x13 | See section 3. | Illustration. Now. |
Watercolour is the wrong tool for this report, for five reasons.
Recommendation: colour marker-doodle (thick black line, one flat colour blob misregistered from the line, on paper #fdfaf1) as the illustration system for the diagram, vignettes, section openers, journey and icons. Approachable photography with the yellow scribble for real marae (case studies, and the cover if a participating marae consents). The two directions share the same yellow and the same hand-drawn mark, so they sit together on a page.
A 3/4 aerial doodle of a composite marae, wonky and deliberately not symmetrical. Buildings: wharenui (plain gable, plain maihi, no carving, no koruru detail, door and window only), wharekai with commercial kitchen, wharepaku/ablution block, a kaumātua flat pair, a kōhanga reo, a shed, carpark, māra kai, marae ātea left open and empty.
Machines and where they go, each with a numbered callout and a one-line label set in type (never drawn): 1. Rooftop solar on the wharekai, ablution block and shed. Panels are not on the wharenui in the base diagram. Whether they may be is a Steering Rōpū decision, and some marae will say yes; make it a toggle in the file. 2. Battery in the shed or on the wharekai wall. 3. Heat pumps on the wharenui (wall units, small and unobtrusive) and ceiling cassettes in the wharekai. 4. Hot water heat pump cylinders behind the ablution block and wharekai. 5. Induction cooktops in the wharekai. 6. EV chargers in the carpark, one public fast charger at the road end, a van and a ute plugged in. 7. Electric ATV and ride-on mower by the shed, electric chainsaw and tools on a rack. 8. Grid connection: a single pole and line, labelled "still connected: exports surplus, covers peaks". 9. Kaumātua flats and kōhanga sharing the marae solar via a small line. 10. Crossed-out LPG bottles and generator at the gate (the "retired" items), drawn in the mono line with no colour.
Colour blobs: yellow on panels and anything solar, blue on grid line and electric machines, mint on grass and whenua, ink line everywhere. One version with callouts for print, one clean version for the web with hover callouts.
Same style, same angle, same scale bar, so the committee compares footprint at a glance. Smaller marae: wharenui plus wharekai plus ablution block. Larger: those plus kōhanga, office, kaumātua flats, bigger carpark. Usage is shown by activity, not by buildings: Low use shows an empty ātea and one car, Medium shows a weekday scene (a few cars, kōhanga sign, lights in the office), High shows a full carpark and lights in every building. A tiny 12-month activity sparkline sits under each vignette (from F5) so the "usage" axis is literally visible. Avoid people on the ātea; keep people at the carpark or wharekai end if shown at all.
Nine full-bleed-top doodles with one yellow blob each, paper background, title set in type: Foreword (sunrise over a plain gable), Background (sun, wind and water as elements, no atua depiction), Marae in Aotearoa (the composite marae from F7, mono), Electric Marae (F7 with colour), Economic (a gas bottle being wheeled out, a heat pump going in), Environmental (whenua, awa, clean air), Resilience (storm at night, one building lit), Mana motuhake (a tanker on the horizon vs a roof of panels), Getting started (the six-step path), Financing (a koha box next to a bank). Do not draw atua, Papatūānuku, Tāwhirimātea or Tama-nui-te-rā as figures; use the natural elements only.
Real photographs of the participating marae, with the yellow scribble overlay, taken or supplied with written consent from the marae committee and sign-off on which buildings and interiors may be shown. If photos are not available, the doodle style stands in. Layout in section 4.
A single winding ink path across a double-page spread, six numbered stops, each with a small doodle icon (goals = a hui circle, map = a bill and a sun, limitations = a switchboard and a roof, proposals = three envelopes, funding = a koha box, capability = two people at a monitor). A yellow blob highlights the stop; the path is drawn so it can be cut into a six-panel vertical for the web and the one-pager.
Mono doodle icons, 1:1, drawn as a single sheet so line weight matches: heat pump (wall unit), hot water heat pump (white cylinder with a fan grille in the top), induction cooktop (commercial six-zone), EV (van, right-hand drive), EV charger (wall box) and fast charger (bollard), solar panel, battery (wall cabinet), electric ATV/side-by-side, ride-on mower, chainsaw with battery pack, generator (crossed out), LPG bottle (crossed out), califont (crossed out). Export as black-on-transparent, recolour to paper or ink for dark or light sections (the conversion trick from the doodle homepage build).
Pass the palette swatch PNG as a reference (refs/palette-2026.png from the 2026-09-11 folder) and the five colour-doodle refs. Flash model, 1K, then upscale the keeper.
Prompt 1, cover base (3:4 portrait) "Hand-drawn colour marker doodle on warm paper #fdfaf1. Thick black felt-tip line (3 to 4 percent of image width), wobbly, overshooting corners, wonky 3/4 perspective, deliberately NOT symmetrical. A small rural Aotearoa New Zealand marae complex at dawn: a plain gabled meeting house with plain bargeboards and a single door, a long dining hall beside it with rooftop solar panels, a small ablution block, a shed, a gravel carpark with one electric van plugged into a wall charger, rolling hills behind. One flat opaque yellow #ffc754 blob misregistered from the line over the sun and the solar panels, one flat mint #c2d0c4 blob over the grass, everything else black line on paper. No carvings, no painted patterns, no faces, no people, no text, no lettering, no logos, no shading, no gradients, no watercolour."
Prompt 2, profile vignette, Smaller marae, Low use (4:3) "Hand-drawn colour marker doodle on warm paper #fdfaf1, thick black felt-tip line, wobbly, 3/4 aerial view from the front-left, deliberately NOT symmetrical, small object alone on paper with generous margin. A small marae: one plain gabled meeting house (plain bargeboards, single door, no carving), one modest dining hall, one small ablution block, a gravel area in front left empty, a single parked car, a flagpole, a low fence. Quiet and still. One flat opaque yellow #ffc754 blob over the dining hall roof misregistered from the line. No people, no text, no lettering, no shading, no gradients, no carvings, no patterns."
Prompt 3, Electric Marae diagram base (16:9) "Hand-drawn colour marker doodle on warm paper #fdfaf1, thick black felt-tip line, wobbly, wide 3/4 aerial view, deliberately NOT symmetrical, lots of empty paper around the scene for labels. A composite marae complex: plain gabled meeting house with plain bargeboards centre-left facing an open empty grassed courtyard, long dining hall to the right with rooftop solar panels and two small heat pump units on its wall, a white hot-water cylinder with a round fan grille built into its top behind the dining hall, an ablution block with solar panels, two small single-storey flats and a small preschool building at the back, a shed with a wall battery cabinet and an electric side-by-side quad and a ride-on mower outside it, a carpark with an electric van and a ute plugged into wall chargers and one tall fast-charger bollard by the road, one power pole and line entering from the road, a vegetable garden. Flat opaque colour blobs misregistered from the line: yellow #ffc754 on all solar panels and the battery, blue #7c96c1 on the power line and chargers, mint #c2d0c4 on grass. No people, no text, no lettering, no carvings, no patterns, no shading, no gradients, no logos."
Prompt 4, resilience section opener (16:9) "Hand-drawn colour marker doodle on warm paper #fdfaf1, thick black felt-tip line, wobbly, deliberately NOT symmetrical. Night storm scene in rural Aotearoa: rain lines, a bent tree, a fallen power line on the road, and in the middle a long gabled community dining hall with every window glowing, rooftop solar panels and a battery cabinet on its wall, a few parked cars outside, a plain gabled meeting house behind it also lit. One flat opaque yellow #ffc754 blob misregistered from the line filling the glowing windows. No people, no text, no lettering, no carvings, no patterns, no shading, no gradients."
Prompt 5, machine icon sheet (1:1, run once per icon) "Mono black felt-tip doodle icon on warm paper #fdfaf1, thick wobbly line, overshooting corners, wonky 3/4 perspective, object alone and centred with wide margin, no fill, no shading, no colour, no text. Subject: [a wall-mounted heat pump indoor unit / a white hot water heat pump cylinder with a round fan grille built into the top / a commercial six-zone induction cooktop / a right-hand-drive electric van plugged into a wall charger / a public fast-charger bollard / a single solar panel at an angle / a wall battery cabinet / an electric side-by-side quad bike / a ride-on mower / a battery chainsaw / a portable petrol generator with a big X through it / a 45 kg LPG bottle with a big X through it / a wall-mounted gas califont with a big X through it]."
Format: A4 portrait print PDF (matches Electric Homes at 104 pages and Electric Farms) plus a web report page on pages.rewiring.nz built the way Electric Homes was (field-driven page, live Recharts charts from the same JSON). Use the 2026 paper-and-ink palette rather than the Electric Homes navy: it is warmer, prints cheaper, photocopies legibly, and the kaupapa (warm, welcoming, mana motuhake) does not want a dark corporate frame. Keep Rubik or whatever Elliot's 2026 type decision is; type sits in ink on paper with yellow 300 highlights for emphasis words.
Grid: 12-column, 16 mm outer margins, body text in a 7-column measure with a 4-column side column for figures, pull-quotes and the profile glyph strip. Charts full-measure, never squeezed into the side column.
Pull-quotes: ink, 20pt, a hand-drawn yellow underline or scribble (the same yellow mark as the photo style), no quote marks box, no rule. Attribution in 9pt. Good candidates already in the text: "If it's sized for the quiet months, it fails exactly when it's needed most", "A single weekend of manaakitanga can set the tariff rate, and the bill, for months", "Make your next decision an electric one".
Big numbers: 40pt ink numeral, 10pt label beneath, in a yellow 100 tile without border. Group them in rows of three. Savings numbers may use good-green for the numeral only.
The six-profiles component: a strip of six glyph tiles (from F13) at the top of every profile page with the current profile filled yellow 100 and the others outlined. The same strip is the "find your marae" lookup on p24 (F10) and the one-pager, with two lines under each tile: "Buildings about x m2" and "Used y days a week". A reader finds themselves in three seconds and the strip is the hyperlink nav on the web.
"Overcoming this challenge" callout: a full-measure mint 100 panel with 12 mm padding, a small doodle icon top-left (a lightbulb with a koru-free line), heading "Overcoming this challenge" in ink 12pt bold, body in regular. No border, no side stripe, no drop shadow. Where the author has not yet written the content (p18, p21, p22, p23), the panel still ships as the pattern with the text to come.
Case study template (two pages each): page 1 is a consented photo with the yellow scribble at the top half, name, rohe, a three-line "who we are" and the F10 glyph for the nearest profile. Page 2 is the F27 before/after pair (bill, emissions), a timeline strip of what was installed when, a pull-quote from the marae, and a mint panel "What we'd tell another marae".
Two-page summary and topic one-pagers: A4 sheet, both sides. Side 1: title, the F7 diagram at half height with eight callouts, three big numbers, the six-profile strip. Side 2: the six-step journey as a vertical, "where the money comes from" matrix, and a QR to the web report. Topic one-pagers (Getting off gas, Solar for marae, Economic, Emissions, Resilience, Mana motuhake, How to, Financing) each reuse one section opener doodle, one chart from the figure list, three big numbers and the QR. Design them as one InDesign template with swappable blocks.
Tables: Table 1 and the benchmark table go to the appendix in a plain style (ink hairlines, no fills, mint 100 header row). The body gets profile cards instead.
Web specifics: charts are the same JSON through Recharts with hover values, NI/SI as a toggle instead of two panels on narrow screens, the F38 Felt map embedded, and the F7 diagram with hover callouts. Everything else mirrors print.
Can start now (no Jenny data needed): 1. Chart system spec and a styled template (title, subtitle, source line, caption, palette tokens, patterns) built once in the chart renderer, plus a test render of F2 to prove it. This unblocks every later chart. 2. Rebuild the existing-data charts in the system: F1, F2, F4, F8, F11, F22, F25 (fix the 700-2P label, split into cost and emissions), F32 (shared axis), F33, F34, F37, F38. 3. Machine icon set (13), the F7 Electric Marae diagram base and the six vignette bases from the prompts above, then a review pack for the Steering Rōpū (cover, F7, vignettes) so sign-off runs in parallel with the modelling. 4. Cover concepts: doodle composite (primary) and, pending consent, a consented photo plus yellow scribble (alternative). 5. Page template in InDesign or Figma: grid, type, pull-quote, big numbers, mint callout panel, the six-profile strip component, case study template, section openers. 6. Two-pager and topic one-pager template. 7. F40 supply-chain strip, F41 journey, F43 three levers, F35 and F26 big-number tiles.
Blocked on Jenny's modelling (ask for everything as one JSON or CSV in the chart renderer's shape): 8. F16.1 to F16.6 (the 6 x 2 islands x 4 scenarios x 2 metrics bill matrix). This is the core deliverable; ask for it first. 9. F28.1 to F28.6 emissions per profile (same shape). 10. F15 waterfall for Smaller Medium NI. 11. F17 to F19 marae-scale per-machine costs, F29 to F31 emissions. 12. F23 three vehicle examples, F24 mowers, F21 solar option cards, F12 regional prices, F5 and F6 load shapes, F39 backup hours, ES1 executive summary numbers.
Blocked on authors or the Steering Rōpū: 13. One naming scheme for the profiles (recommend Smaller / Larger x Low / Medium / High). 14. Figure renumbering and replacing every "Figure X" and every colour-named reference in the body text (coordinate with the copy editor). 15. Case study photos and consents (Ōnuku, Whakatu, third marae) and sign-off on cover, F7, vignettes. 16. Decision on F9 (chart vs big numbers) and F36 (EECA indoor air content).
Reviewer role: Communications tactics strategist Date: 6 October 2026 Basis: the 85-page draft (marae_clean.txt), the Google Doc planning and notes tabs, and four quick fact checks (noted in section 0).
Fact checks used (do not cite beyond these without re-verifying): - Māori Climate Platform: all funded projects complete by 30 June 2026; Budget 2024 and 2025 cuts; 21 projects, 60-plus marae; third stage about $1.36m for four more projects (environment.govt.nz, RNZ, Stuff, mcert.govt.nz). - TPK "Marae of Aotearoa" dataset: 1,060 marae records; TPK 2018 cited "approximately 1,100 marae" (hub.arcgis.com, TPK). - NICF 2026 hui: 20 to 22 Oct Tauranga Moana (Kohinga Koha); 23 to 25 Nov Takina, Wellington (iwichairs.maori.nz). - Electric Homes and Vehicles 2026: released on a Monday with a media release, "$3,000 a year" headline, RNZ and NZ Herald coverage (rewiring.nz, nzherald.co.nz, 28 June 2026).
| Audience | What they need from the report | The ONE message | Format they will actually consume | Credible messenger | Ask / CTA |
|---|---|---|---|---|---|
| Marae committees and trustees (volunteer-led, time-poor) | "Which profile am I, what will it save, where do I start, who do I call" | "Make your next replacement an electric one. You do not have to do it all at once." (draft s5.2.5 and s9.2) | Two-pager + the "Getting started" six steps as a one-page checklist + a hui kōrero (in person or Zoom) with a marae that has done it. The full report is a reference, not a read. | Another marae committee (Ōnuku, Whakatu); a trusted hapū tradie; Rewiring's Māori authors (Michael Rewi, Will Edwards, Juliet Tainui-Hernandez) | Download the two-pager; find your profile; book a free kōrero with Rewiring or the Iwi Leaders Group; pull a year of bills together (Step 2) |
| Rūnanga and post-settlement iwi entities (capital holders, programme designers) | The investment case, the revolving-fund and bulk-buy models (s9.2), and the generation/lines investment thesis (s9.3) | "Electrify every marae in the rohe with one programme, not fifty grant applications." | Full report + 6-slide board deck + the Financing secondary resource. Will read the economics section and the profiles table. | Iwi Chairs Forum / Electrification Iwi Leaders Group; Marama Royal; an iwi CFO or investment arm that has already done it (Ngāi Tahu, Tainui Group Holdings-type peer) | Fund a feasibility study across your marae; set up a revolving fund; put marae electrification on the next rūnanga agenda |
| National Iwi Chairs Forum and Electrification Iwi Leaders Group | A mandate document they can carry into Crown engagement; the policy asks in s9.1 | "Marae are national resilience infrastructure. Treat them that way in policy and funding." | Hui presentation (20 min + kōrero), the Mana Motuhake secondary resource, the numbered ask list (section 6 below) | Marama Royal (foreword, Chair Pou Take Ahuarangi); Steering Rōpū members; Kiritapu Allan as author | Endorse the report; adopt the ask list as an NICF position; carry it to the Crown-NICF engagement table |
| Central Government ministers (Energy, Māori Development, Māori Crown Relations, Climate Change, Emergency Management, Finance) | Something they can fund or announce that fits coalition framing | "Cheapest energy in New Zealand, made on the marae, keeps communities running when the grid fails. This is cost of living and civil defence, not a subsidy." | One-page ministerial brief with the hero number, three asks, and one case study photo. Never the full report. | Rewiring CEO/author team with an NICF co-signatory; a marae chair from the minister's own electorate or rohe | Replace the Māori Climate Platform with a dedicated marae electrification fund that covers machines, not just roofs; direct MBIE/EECA to include marae in resilience programmes |
| Officials (MBIE, Te Puni Kōkiri, EECA, Electricity Authority, Commerce Commission, NEMA) | Evidence they can cite: profile modelling, tariff misclassification (s5.2.3), demand-charge problem, grid-connected stance, hazard exposure stats | "Marae are mis-sold and mis-tariffed. Fix classification, export pricing and MTR and a lot of this unlocks without new money." | Full report + methodology appendix + a technical briefing. These readers will check the assumptions, so the appendix must be complete. | Jenny Sahng (modelling), Rewiring policy lead | EA: progress Multiple Trading Relationships and fair export pricing; ComCom: look at demand-charge and connection classification for community facilities; TPK: fold electrification into Marae Development; NEMA/CDEM: marae resilience standard |
| Local councils and CDEM groups | Where marae are in their hazard maps; what an electrified marae gives them as a welfare hub | "An electrified marae is a civil defence hub that does not need a diesel delivery." | Resilience secondary resource (one-pager) + a regional map (the Felt solar map already exists; add TPK marae locations over flood zones) | The CDEM Group's own Māori liaison; a marae that acted in Gabrielle, Jan 2026 floods or Vaianu | Include marae electrification in Long Term Plan resilience budgets and community resilience plans; fund battery backup for designated welfare hubs |
| Funders and philanthropy (Rewiring's own funders, Tindall, Todd, Foundation North, community trusts, Ngā Hua Puāwai) | A fundable programme with unit economics and a pipeline of marae | "A one-off grant buys a permanent cut in a marae's running costs. The savings compound forever." | Economic Benefits two-pager + a one-page "fund a marae" model (cost per marae, savings per year, payback). Kohinga Koha hui 20 to 22 Oct is the perfect room. | Rewiring CEO + a rūnanga partner + an iwi investment arm | Co-fund a 10-marae demonstration cohort across the six profiles; fund feasibility studies (the draft explicitly asks for these, s8.2) |
| Installers, retailers, lines companies | What marae actually need (peak sizing, three-phase, demand profile, islanding), so they stop mis-selling (s5.2.6) | "Marae are not households with a big kitchen. Size for the tangihanga, not the Tuesday." | Technical one-pager ("Selling to marae: what's different") + a webinar via SEANZ and the Electricity Networks Aotearoa (ENA) network | Rewiring technical lead; a kaupapa Māori installer; a lines company that has done a marae project (Counties Energy, Unison, Eastland/Firstlight) | Adopt the marae sizing checklist from s7 Step 4; offer marae-specific tariffs; join a preferred-supplier list |
| Media (Māori, mainstream, trade) | A number, a face, a place, a villain or a tension, and pictures | Māori media: "Marae leading the energy transition on their own terms." Mainstream: "Marae could save $X a year and keep the lights on in the next cyclone." Trade: "Marae are mis-tariffed and under-sized. Here's the data." | Media release + hero stat tile + case-study video (90s) + photos + an embargoed briefing for 3 or 4 journalists | Marama Royal and a marae chair for Māori media; Rewiring CEO for mainstream; Jenny Sahng for trade | Cover the launch; visit a case-study marae |
| Whānau at home | "Can I do this at my place, and can my marae help me?" | "Your marae is showing the way. Your home can follow." (s6.1.3 and s9.2) | Social video clips of the marae kōrero; a link to the Electric Homes calculator; iwi Facebook pages and pānui | Their own marae and iwi comms teams, not Rewiring | Share the clip; ask your marae committee about it; use the Electric Homes tools for your own whare |
Note on hui kōrero: for marae committees, the most consumed "format" is a conversation. Budget for 6 to 10 regional hui (in person where possible, via rūnanga networks) and treat each as both distribution and case-study harvesting.
| # | Claim (as the draft states it) | Where | Data status | Carry a campaign? |
|---|---|---|---|---|
| 1 | Solar is the cheapest energy in NZ: a 9kW system produces at roughly $0.06 to $0.12/kWh vs grid $0.26 to $0.40/kWh delivered. "No retailer offers a 30-year contract anywhere near that price." | p19 | Numbers present (from Electric Homes). Residential system, not marae-sized. | Yes, strong. Needs a marae-sized restatement. |
| 2 | Two-thirds of marae are exposed to at least one significant hazard; 45% in flood zones; 40% in damaging earthquake shaking zones (Vercoe, 2025). | p66 | Cited. Verify source and get permission to reuse the stat. | Yes, this is the resilience hero stat. |
| 3 | Māori Climate Platform supported solar and resilience infrastructure across more than 60 marae, and that funding is now ending. | p77 | Confirmed by MfE and RNZ. | Yes, this is the news hook. |
| 4 | Electricity prices up about 20% in two years; residential gas/LPG up about 20% in a year; NZ gas reserves down 27% year-on-year; Vector forecasting no new residential gas connections after 2028. | p18, p21 | Several (REF) placeholders. Must be sourced before launch. | Yes, once sourced. |
| 5 | NZ spends roughly $20 billion a year, $55 million a day, on imported fuel; Marsden Point closed 2022, so every drop arrives as a finished product. | p69 | Cited to Rewiring 2025. | Yes, the mana motuhake / energy security tile. |
| 6 | Heat pumps 2 to 4x more efficient than gas, induction 2 to 3x, EVs 3 to 5x; a gas water heater runs at about 80% efficiency vs a heat pump water heater at about 325%. "A shower on solar and a heat pump water heater costs less than a quarter of a gas shower." | p10, p29, p40 | Numbers present. Internal inconsistency: EVs are "3-5x" on p10 and "2-4x" on p29. Fix. | Yes. The shower line is the most human. |
| 7 | Electric ATV saves $13,000 to $44,000 over 15 years vs petrol. | p48 | Has numbers and a figure. Contains an error: "4 hours a week, 6240 hours a year" (4 h/wk is about 208 h/yr). | Niche but fun for rural audiences. Fix the hours. |
| 8 | 84% of NZ's 10.2 million fossil fuel machines are ready to electrify today. | p29 | From Rewiring's Machine Count. | Supporting tile, not a lead. |
| 9 | Average run of low-sun days is about 2; the worst in 10 years in most regions was about one week (UC solar irradiance work, Felt map). | p67 | Present and mapped. | Yes, as the pre-bunk for "the sun doesn't always shine". |
| 10 | Gas cooktop produces about 6x the lifetime emissions of electric; LPG water heater 13x; LPG space heater 16x. | p13 | Present (from Electric Homes). | Secondary; emissions is not the lead frame for most audiences here. |
The report currently lacks one. Options, in order of preference:
Stat tiles (bracketed values pending modelling): 1. "$[X] a year": what a medium-use marae saves going fully electric with solar and batteries. 2. "1,060 marae across Aotearoa. Two-thirds sit in a hazard zone. 45% are in flood zones." 3. "Solar: 6 to 12 cents a kWh. Grid: 26 to 40 cents. No retailer offers a 30-year contract at that price." 4. "A shower heated by solar and a heat pump costs less than a quarter of a gas shower." 5. "$55 million a day leaves Aotearoa to buy fuel we could make at home." 6. "60-plus marae got solar through the Māori Climate Platform. That fund ended on 30 June 2026." 7. "Worst run of low-sun days in ten years: about one week. Average: two days."
Pull-quotes (from the draft, lightly tidied): 8. "For generations, marae have been the beating heart of our communities... Electrification offers a different path: one grounded in self-determination." (Marama Royal, foreword) 9. "If it's sized for the quiet months, it fails exactly when it's needed most. If it's sized for the large spikes, it sits underused nearly all year." (p16) 10. "A single weekend of manaakitanga can set the tariff rate, and the bill, for months." (p20)
Bonus: "Make your next decision an electric one." (p78) is the whole marae-committee CTA in six words. Use it everywhere.
Act 1: The marae holds everyone, and the bill holds the marae. Open on a marae in a tangihanga or a cyclone: the wharekai feeding hundreds, the califont running non-stop, the diesel generator that could not be refuelled because the road was out. Then the bill: commercial tariffs set by one weekend, LPG up 20%, a fixed line charge paid every day of a quiet month. The tension: the place that carries the community is being carried by koha and raffles.
Act 2: The sun is already on the roof. Solar is now the cheapest energy in New Zealand, and marae are daytime users with big roofs and land. Pair it with a backup-capable battery and electric machines (heat pump, hot water heat pump, induction) and the marae saves $[X] a year, stays warm, cooks for a fraction, and keeps running when the lines come down. Show the case studies: Ōnuku, Whakatu, a third. Make a kaumātua the narrator, not Rewiring.
Act 3: Make the next decision an electric one, and make the system catch up. For marae: six steps, no need to do it all at once. For iwi: one programme across the rohe, a revolving fund, a stake in generation and lines. For Government: a dedicated marae electrification fund to replace the Platform, funding for machines not just roofs, fair export prices, MTR and peer-to-peer trading, and recognition of marae as resilience infrastructure. Close on mana motuhake: energy made on the whenua, priced at home, controlled by the people it belongs to.
For hui, flip the order of Acts 2 and 3 as needed: rūnanga audiences want the ask before the explanation.
| Phase | Window | What happens | Gate |
|---|---|---|---|
| 0. Finish the draft | Oct 2026 | Modelling complete, six profiles charted, hero number agreed, three case studies interviewed and consented, (REF)s resolved, methodology appendix written | Jenny's modelling + Josh's data review signed off |
| 1. Steering Rōpū sign-off | late Oct / early Nov | Full read by the 12-member Rōpū; cultural and te reo review; case-study marae approve their pages; Marama Royal approves the foreword in final context | Written sign-off from Rōpū; written consent from each case-study marae |
| 2. Kohinga Koha hui (optional) | 20 to 22 Oct, Tauranga Moana | If a near-final economics section exists: a 10-minute "coming soon" to the investor and philanthropy room with the funder one-pager. If not, skip and brief funders one-to-one. | Rewiring CEO judgement call |
| 3. NICF presentation | 23 to 25 Nov, Takina, Wellington | Present the final report to the Forum via Pou Take Ahuarangi; seek endorsement of the ask list; embargoed copies to iwi comms teams | NICF endorsement (or at minimum Pou Take Ahuarangi endorsement) |
| 4. Pre-launch | week of 30 Nov | Embargoed briefings: Whakaata Māori, RNZ Te Ao Māori, Te Ao Māori News, Waatea, plus one mainstream (RNZ or Herald) and one trade (Energy News). Minister briefings via NICF channels. | Media release and assets final |
| 5. Public launch | Tue 8 Dec 2026 at the latest, or Tue 9 Feb 2027 | rewiring.nz page live, release out 6am, case-study video out, Māori media interviews first, mainstream from 9am | Hero number and case studies published together |
| 6. Roadshow | Feb to May 2027 | 6 to 10 regional hui via rūnanga; two-pager and checklist in hand; Waitangi week and Te Matatini-adjacent timing for Māori media pick-up | Rūnanga hosts confirmed |
Recommendation: unless the modelling and case studies are locked by mid-November, go for 9 February 2027. A December launch into the holiday period wastes the case-study content and lands after most rūnanga have closed for the year. Electric Homes launched on a Monday in late June; a Tuesday morning gives Māori media's daily bulletins a clean run.
| Outlet | Angle | Spokesperson | Asset |
|---|---|---|---|
| Whakaata Māori (Te Ao Māori News, Te Ao with Moana) | Marae leading the transition; Platform funding ended | Marama Royal, case-study marae chair | Case-study video, on-marae interview |
| RNZ Te Ao Māori and RNZ National | Savings + resilience + Platform cut | Rewiring CEO + Michael Rewi or Will Edwards | Release, hero stat, Felt map |
| Waatea News and iwi radio network (21 stations) | Regional case study in each rohe | Local marae chair | Audio grabs in te reo and English |
| NZ Herald, Stuff, The Post, 1News, Newshub successor | "$X a year and the lights stay on"; the demand-charge injustice | Rewiring CEO, Jenny Sahng | Release, two charts, photos |
| The Spinoff Ātea, E-Tangata | Mana motuhake essay | Will Edwards (author of the mātauranga section) | Long-form op-ed |
| Energy News, BusinessDesk, Newsroom | Tariff misclassification, MTR, export pricing, grid-connected stance | Rewiring policy lead | Technical briefing, methodology |
| Regional papers (Gisborne Herald, Hawke's Bay Today, Northern Advocate, Whakatāne Beacon) | Local marae resilience after Gabrielle / Jan 2026 floods / Vaianu | Local marae and CDEM | Local case study |
| Asset | Format and length | Primary audience | Owner | Dependency |
|---|---|---|---|---|
| General Two Pager | A4 double-sided PDF + web page; hero number, three benefits, six steps, three asks, QR to report | Marae committees, media, ministers | Rewiring comms; OJ design | Hero number, one case-study photo |
| Getting off Gas for Marae | 4-page guide; LPG and reticulated gas costs, califont to hot water heat pump, cooktop to induction, three-phase note, disconnection fee saving | Marae committees, installers | Rewiring technical; co-badge EECA if possible | Per-machine savings (s6.1.6.2 and 6.1.6.3); fix the $720 vs $800 figure |
| Solar for Marae | 4-page guide; sizing for peaks, roof vs ground mount, regional capacity table, backup-capable batteries, the Felt map | Marae committees, rūnanga, installers | Rewiring technical; OJ for the map | s6.1.6.4 content (currently empty) and the regional solar table |
| Economic Benefits | 2-page; six-profile savings, stacking waterfall, lifetime cost per machine | Rūnanga, funders, Treasury-minded officials | Jenny Sahng; OJ charts | All s6.1 charts |
| Emissions | 1-page; per-machine lifetime emissions multiples, embodied emissions rebuttal, circularity | Climate-focused funders, MfE, media | Rewiring | s6.2 charts |
| Resilience | 1-page; hazard stats, outage behaviour, backup battery explainer, V2G horizon | CDEM, NEMA, councils, ministers | Rewiring + a CDEM reviewer | Vercoe 2025 permission; islanding wording |
| Mana Motuhake | 2-page essay; whakapapa and energy, $55m a day, Marsden Point, rangatiratanga | NICF, Māori media, iwi | Will Edwards / Michael Rewi | Foreword and s3.1, s6.4 |
| How to | 1-page checklist; the six steps and the Step 4 proposal checklist as tick boxes | Marae committees | Rewiring; OJ layout | s7 (complete) |
| Financing | 2-page; pre- and post-settlement pathways, revolving fund model, what should exist | Rūnanga, funders, TPK | Rewiring policy | s8 (needs fleshing out from bullets) |
| Slide deck (not listed, needed) | 12 slides for NICF and rūnanga hui | NICF, rūnanga | Rewiring; OJ design | Everything above |
| Case-study videos (not listed, needed) | 3 x 90 seconds + 3 x 30-second cuts, vertical and horizontal | Media, social, whānau | Rewiring video (or Remark) | Consent, interviews, on-site shoot |
| Ministerial one-pager (not listed, needed) | 1 page; hero number, three asks, one photo, NICF co-signed | Ministers | Rewiring policy + NICF | Ask list sign-off |
| Priority | Archetype (from notes) | Candidate | Why it carries the launch |
|---|---|---|---|
| 1 | Gold Standard (fully electric, solar + battery, maybe EV charging) | Ōnuku Marae (Ngāi Tahu, Akaroa) or whichever marae is furthest along | Proves the whole thesis in one place: before and after bills, the warm wharenui, the kai cooked on induction. This is the hero video. |
| 2 | High Climate Risk / resilience | A Te Tairāwhiti, Te Matau-a-Māui, Te Tai Tokerau or Bay of Plenty marae that acted in Gabrielle, the Jan 2026 floods or Vaianu | Gives the resilience frame a face and a place. Strongest for CDEM, councils, ministers and mainstream media. Must have a backup-capable battery to avoid the islanding trap. |
| 3 | Iwi programme / Mass Solar Adoption | Whakatu Marae (Nelson) if it fits, or a rūnanga that rolled out solar across several marae | Speaks to rūnanga and funders: "this scales". Shows the one-programme-not-fifty-grants model. |
| 4 | Beginning Journey / No previous thought | A marae that has just pulled a year of bills together and is deciding | Lets most marae "see themselves". Low production cost: a kōrero, a photo of the committee, the bills on the table. Can be the roadshow's recurring story (update it every hui). |
Hold "Marae with whānau business" and "Microgrid" for the roadshow and the rewiring.nz page; they are great second-wave stories but complicate the launch message.
Balance: at least one North Island and one South Island, at least one rural and one urban, at least one that is pre-settlement or hapū-funded so the story is not "only rich iwi can do this".
The draft's section 9.1 is prose addressed to "Government". Sharpen it into this numbered list. Each ask has a decision-maker and a cross-spectrum frame that keeps the kaupapa Māori core.
| # | Ask | Decision-maker | Cross-spectrum frame | Kaupapa Māori frame |
|---|---|---|---|---|
| 1 | Replace the Māori Climate Platform with a standing Marae Electrification and Resilience Fund that covers solar, backup-capable batteries and electric machines | Minister for Climate Change and Minister for Māori Development (via MfE, now MCERT, and TPK); Minister of Finance for Budget 2027 | Civil defence infrastructure: cheaper than diesel generators and emergency response; 60-plus marae already prove the model | Marae carry the community in every crisis; the Crown should back that, not step away from it |
| 2 | Fund the machines, not just the roof: extend any marae energy funding to heat pumps, hot water heat pumps, induction and EV chargers | TPK (Marae Development), EECA, MBIE | Value for money: a roof of solar with gas in the kitchen captures a fraction of the saving | A warm wharenui and a smoke-free wharekai are manaakitanga |
| 3 | Fair export pricing for solar sent back to the grid | Electricity Authority (export pricing and distribution pricing reform); Minister for Energy | Cost of living: households and marae are paid 8 to 17c for power that is resold at 20 to 30c | Energy made on the whenua should keep its value in the community |
| 4 | Deliver Multiple Trading Relationships and enable peer-to-peer sharing so a marae can direct surplus to papakāinga and whānau | Electricity Authority; Minister for Energy | Competition and consumer choice; local energy keeps lines upgrades down | Marae as a local energy hub: the whakapapa of sharing kai extends to sharing power |
| 5 | Fix tariff misclassification and demand charges for community facilities: a review of how marae are classified and billed, and a plain-language right to a tariff check | Commerce Commission (Part 4 and default price-quality), Electricity Authority (consumer care), Utilities Disputes | Fairness: a weekend of use should not set a year of bills; many marae are on the wrong plan | Marae are not businesses; billing should reflect what they are |
| 6 | Recognise marae as national resilience infrastructure in the National Emergency Management Agency framework and CDEM Group plans, with a resilience standard (backup power, essential-load islanding) for designated welfare hubs | Minister for Emergency Management and Recovery; NEMA; CDEM Groups | Every region's own flood and cyclone experience; backup-capable batteries beat generators when roads are cut | Marae have always been the refuge; make it official and resource it |
| 7 | Include marae in the national charging rollout: count marae chargers toward the 10,000-by-2030 target, confirm the NES-ETA permitted-activity change for marae, and open EECA co-funding to marae hosts | Minister of Transport; EECA; MfE (NES-ETA) | Rural charging gaps closed cheaply on land already connected and parked | Marae as electric corridors, hosting manuhiri on the road the way they always have |
| 8 | A national energy strategy built on Aotearoa-made energy that treats distributed generation, including on marae, as part of the system | Minister for Energy; MBIE (energy strategy work) | Energy security: $55 million a day offshore, Marsden Point gone, gas declining | Rangatiratanga over the resources that let a marae function |
| 9 | Resilience standards for new and rebuilt marae (the draft's own s8.3 ask) funded through existing TPK capital programmes | TPK; MBIE Building; Minister for Māori Development | Build once, build right; avoid retrofit cost | Intergenerational thinking: build for the mokopuna |
Framing rules for the campaign: - Lead with cost of living, resilience and energy security in mainstream and Government rooms; lead with mana motuhake and manaakitanga in Māori rooms. Never drop either; order them for the audience. - Avoid "subsidy". Use "infrastructure investment", "resilience funding" and "replacing a fund that already works". - Always pair an ask with a number and a marae. Ask 1 is strongest when a Gabrielle or Vaianu marae says it. - Make the grid-connected stance explicit in every Government conversation: the report is not asking for off-grid separation, it is asking for marae to be treated as part of the system.
| Risk | Pre-bunk / mitigation |
|---|---|
| Rewiring seen as speaking for marae or over iwi | Marama Royal and the Steering Rōpū front the launch; Rewiring is "the research partner". Every public statement names the NICF relationship. The foreword goes first in every asset. |
| Naming marae, people or bills without proper consent | Written committee-level consent (s5.2). Withdrawal right up to publication. Composite profiles are explicitly "not any actual marae" (the draft already says so on p24; keep that line in the two-pager). |
| Te reo errors in a report about marae | Independent te reo review (macrons, "hapū" is inconsistently spelled "hāpu" throughout the draft; "whare nui" vs "wharenui"; "Papatuanuku" vs "Papatūānuku"; "Kiritapu Allen" vs "Allan" on p1 and p3). Fix before Rōpū sign-off. |
| Pan-iwi or urban marae feel excluded by an iwi-led frame | Include a pre-settlement or urban case study; the High-use profile already describes a pan-iwi marae (p29). |
| Tikanga around money and savings talk on the marae | Frame savings as "what the hapū can now do", matching the draft's own language (p31): te reo, scholarships, māra kai, deferred maintenance. |
| Wāhi tapu, photography and filming on the marae | Follow each marae's kawa; agree shot lists in advance; no filming of tangihanga. |
| Risk | Pre-bunk / mitigation |
|---|---|
| "Subsidies for marae" or race-based funding backlash | Lead with "replacing a fund that already helped 60-plus marae become civil defence hubs". Pair every ask with a resilience or cost-of-living number. Note that marae serve "everyone in the district" in a disaster (p66). Use Government's own 10,000-charger target as common ground. |
| Treaty-related backlash to the mana motuhake framing | Keep mana motuhake as the Māori-audience frame and energy security as the mainstream frame; they are the same argument ($55m a day offshore) told two ways. Avoid making the mainstream release about Treaty rights. |
| Attacking the Government over the Platform cut makes ministers defensive | Give ministers a way to say yes: "a standing fund" is a new announcement, not a reversal. Brief the Minister for Māori Development's office before launch via NICF. Let NICF, not Rewiring, carry any criticism. |
| Rewiring's non-partisan standing | All asks are policy, not party. Offer briefings to all parties' energy and Māori development spokespeople the same week. |
| Election year (2026) positioning | If launch slips to February 2027, the asks land as Budget 2027 bids. Say so in the ministerial one-pager. |
| Risk | Pre-bunk / mitigation |
|---|---|
| "Solar keeps the lights on in an outage" when grid-tied systems shut down | Every resilience statement says "solar with a backup-capable battery (islanding)". Add a plain box in the report and the Solar for Marae guide: "Not all batteries keep you running in a blackout. Ask your installer for backup capability and which circuits it covers." Step 4's checklist already asks for "critical battery backup"; make the two-pager match. |
| "It's cheaper to stay on LPG" from gas industry voices | The draft already concedes the per-kWh comparison on p12 and wins on efficiency; keep that honesty. The gas reserves and Vector 2028 facts do the rest. |
| "The sun doesn't always shine" | The Felt map and the "about one week worst case in ten years" stat (p67). Keep it in the two-pager. |
| Modelling challenged by officials or installers | Complete methodology appendix; publish assumptions and prices as of 2026; note the exclusion of 2026 fuel shocks (conservative). Offer the model for review. |
| Savings claims mismatch across assets | Single source of truth sheet for all numbers (Jenny owns it); OJ builds every tile from it. The draft already has three internal inconsistencies (EV efficiency multiple, gas fixed charge, ATV hours). |
| Vehicles and ATV numbers overpromised | Vehicles are excluded from the profile savings; say so on every profile tile. Fix the ATV "6240 hours a year". |
| Reusing Vercoe 2025 and Awatere 2025 stats | Get permission and the exact citation. These are the resilience hero stats and must be bulletproof. |
| Installers mis-sell on the back of the report | Installer one-pager and the Step 4 proposal checklist. Consider a Rewiring "ask these ten questions" card for marae. |
The four reviews were produced on 6 October 2026 by role agents working from the PDF draft and the Google Doc planning and notes tabs. Page numbers refer to the PDF. Facts the comms review gathered from the web (Forum dates, Platform funding, marae counts) are marked in its section 0 and should be re-verified before use. Source files sit in Downloads\electric-marae-review.